Pioneer 500 ST Installation Manual page 14

Table of Contents

Advertisement

3. Center door assembly on clear
opening. Align the bottom of
each vertical member with the
respective framing board or
posts of the clear opening.
NOTE: The vertical members
should be aligned so that their
outer flanges will exactly
overlap with the framing
boards or posts when the door
assembly is raised into
position.
4. Assemble workers and
equipment into position on
each side of the door assembly.
IMPORTANT: SLOWLY
LIFT TOP OF DOOR
ASSEMBLY TO RAISE THE
DOOR. See Diagram 6.
Diagram 7
5.
Lean door assembly upright against clear
opening.
6.
Carefully press flanges of the door
assembly flush against faces of framing
boards or posts.
7.
Fasten Tek screws (in steel) or lag screws
(in wood) through the flanges on sides of
door assembly. Securely tighten all
screws.
8.
On the lower and upper flanges of the
horizontal member there are attachment
points for fastening screws. Fasten Tek
screws (in steel) or lag screws (in wood)
Part No. 4801-5154 Rev 4-08
Drill 1/4" Hole and
Install Hammer Set
Anchors
500 ST Door
Diagram 6
through the holes. This secures the top of
the door to the clear opening.
9.
Locate the two floor mounting holes at
the bottom of the left and right tracks.
See Diagram 7.
10.
Drill a 1/4" hole and install Hammer Set
Anchors (1002-6030) in both right and
left tracks. See Diagram 7.
11.
This completes fastening of the door
assembly to the clear opening.
Page 14 of 25

Advertisement

Table of Contents
loading

Table of Contents