Download Print this page

Lightolier Multi-Lyte ML Instruction Sheet

Lightolier lighting systems instruction sheet

Advertisement

Quick Links

IS_ML
Lighting Systems
RETAIN THESE INSTRUCTIONS FOR MAINTENANCE REFERENCE.
MMA & MFA
MMD & MFD
MMC & MFC
MME & MFE
MMB & MFB
We reserve the right to change details of design, materials and finish.

Advertisement

loading

Summary of Contents for Lightolier Multi-Lyte ML

  • Page 1 IS_ML Lighting Systems RETAIN THESE INSTRUCTIONS FOR MAINTENANCE REFERENCE. MMA & MFA MMD & MFD MMC & MFC MME & MFE MMB & MFB We reserve the right to change details of design, materials and finish.
  • Page 2 IS_ML Lighting Systems TABLE OF CONTENTS STEM MOUNT INSTALLATION ...3 CABLE MOUNT INSTALLATION ..7 ...10 ...12 ...1 ...16 ...1 We reserve the right to change details of design, materials and finish.
  • Page 3 STEM MOUNT INSTALLATION Step 1. Install MOUNTING BRACKET to Step 2. Mark and Drill Hole Step 3. Secure MOUNTING BRACKET Attach Opening of all MOUNTING BRACKETS must be aligned in same direction. Step 4. STEM Shortening Step 5. Remove SAFETY CLIP Remove from 30”...
  • Page 4: Lighting Systems

    STEM MOUNT INSTALLATION (CONT’D) Step 6. Replace S AFETY CLIP Replace Step 7. Secure CANOPY Snap onto 3/4” (1.91CM) Ø HOLE TOGGLE WING NUT (BY OTHERS) TOGGLE WING BOLT (BY OTHERS) 8-32 SCREW (BY OTHERS) Lighting Systems MOUNTING BRACKET BALL ALIGNER CANOPY STEM Figure 2...
  • Page 5 CABLE MOUNT INSTALLATION Step 1. Install CROSSBAR to J-BOX [4” (10.16cm) Octagon By Others] Step 2. Mark and Drill Hole 30” (76.20cm) for 4-foot Individual Fixture 60” (152.40cm) for 8-foot Individual Fixture 9’ (274.32cm) Max. for Continuous Runs 8-32 SCREW (BY OTHERS) CROSSBAR Lighting Systems...
  • Page 6 CABLE MOUNT INSTALLATION (CONT’D) Step 3. Secure CROSSBAR Step 4. Wiring Step 5. Secure CANOPY 3/4” (1.91CM) Ø HOLE (2X) TOGGLE WING NUT (BY OTHERS) TOGGLE BOLT (BY OTHERS) CABLE CHANNEL MOUNTING BRACKET ASSEMBLY CROSSBAR CROSSBAR POWER CORD COLLAR CANOPY SCREW CHANNEL Figure 5...
  • Page 7 CHANNEL MOUNTING STEM & WIRING Step 1. SUPPLY WIRES Step 2. CHANNEL MOUNTING BRACKET ASSEMBLY CHANNEL SCREW CHANNEL MOUNTING BRACKET ASSEMBLY STEM SUPPLY WIRES BRASS FITTING CHANNEL CHANNEL MOUNTING BRACKET ASSEMBLY DETAIL “A” STEM SUPPLY WIRES BROWN CONNECTORS Figure 6 We reserve the right to change details of design, materials and finish.
  • Page 8 CHANNEL MOUNTING STEM & WIRING (CONT’D) Step 3. BROWN CONNECTOR Step 4. Repeat Steps Above as Necessary Step 5. Secure STEM SUPPLY WIRE (BY OTHERS) THRU WIRE Lighting Systems THRU WIRE BROWN CONNECTOR LEADS (BALLAST OR TRACK) Figure 7 We reserve the right to change details of design, materials and finish. IS_ML...
  • Page 9 CHANNEL MOUNTING CABLE & WIRING Step 1. Slide Through POWER CORD Step 2. Channel Mounting Bracket Assembly Step 3. BROWN CONNECTOR Step 4. Connect Wires Finish connection with BROWN CONNECTOR flap and do the same for all three wires according to color. Step 5.
  • Page 10 CHANNEL CONNECTIONS & WIRING Step 1. Step 2. SCREW #1 SCREW #3 SCREW #2 FEMALE SPLINE Step 3. Step 4. Step 5. SCREW #2 Lighting Systems MALE SPLINE Figure 9 SCREW #1 SCREW #3 HAIRLINE JOINT Figure 10 We reserve the right to change details of design, materials and finish. IS_ML CHANNEL ALUMINUM EXTRUSION...
  • Page 11: Quick Connector

    IS_ML Lighting Systems CHANNEL CONNECTIONS & WIRING (CONT’D) Step 6. THRU WIRES QUICK CONNECTOR HAIRLINE JOINT Figure 11 We reserve the right to change details of design, materials and finish.
  • Page 12 MODULE WIRE & MOUNTING Step 1. Step 2. Step 3. Step 4. PARTS BAG BROWN CONNECTORS SUPPLY WIRES BROWN CONNECTORS LOCKING CLIP END CAP SANP-IN COVER Lighting Systems WIRE-WAY COVER THUMB SCREW HOOK BRACKETS MODULE (LIGHTING FIXTURE) QUICK CONNECTORRS Figure 12 We reserve the right to change details of design, materials and finish.
  • Page 13: Thumb Screws

    IS_ML Lighting Systems MODULE WIRE & MOUNTING (CONT’D) Step 5. Step 6. Step 7. THUMB SCREWS. Step 8. Step 9. Step 10. We reserve the right to change details of design, materials and finish.
  • Page 14 MULTI-LYTE TRACK MOUNTING Step 1. Step 2. Step 3. Unscrew COVER from LIVE END. Step 4. Step 5. Step 6. Replace COVER to LIVE END. Step 7. PARTS BAG BROWN CONNECTORS 18GA. SUPPLY LEADS Lighting Systems GROUND LEAD GREEN GROUND SCREW BLACK LEAD (HOT) SCREW TERMINALS...
  • Page 15 IS_ML Lighting Systems MULTI-LYTE TRACK MOUNTING (CONT’D) Step 8. Step 9. Step 10. Step 11. Step 12. WAIRE-WAY COVER BROWN CONNECTORS END CAP SNAP-IN COVER TRACK ADAPTER LIVE END CHANNEL TRACK DEAD END COVER PLASTIC WASHER 8-32 X3/4” FLAT HEAD SCREW Figure 14 We reserve the right to change details of design, materials and finish.
  • Page 16 X, L, T-JOINER MOUNTING Step 1. CABLE GRIPPER Step 2. CABLE SET STEM SET CABLE SET STEM SET CHANNEL MOUNTING BRACKET ASSEMBLY Figure 15 BRASS FITTING BRASS FITTING Figure 16 BRASS FITTING BRASS FITTING Figure 17 We reserve the right to change details of design, materials and finish. IS_ML Lighting Systems...
  • Page 17 IS_ML Lighting Systems X, L, T-JOINER MOUNTING (CONT’D) Step 3. ATTENTION: Maximum distance between suspension points is 9ft (274.32cm). Maximum load on each 10-foot section is 80lbs (36.29kg). Note: Each 4-foot module weighs a maximum of 20 pounds (9.07kg) . Each 8-foot module weighs a maximum of 40 pounds (18.14kg). We reserve the right to change details of design, materials and finish.
  • Page 18 IS_ML Lighting Systems PATTERNS 5ft CHANNEL STEM OR CABLE MOUNTING L-JOINER T-JOINER 10ft CHANNEL 5’ 6” (167.64cm) X-JOINER 5’ 6” (167.64cm) 5’ 6” (167.64cm) 10’-6” (320.04cm) Note: Maximum distance between mounting locations is 9’ (274.32cm) Figure 18 We reserve the right to change details of design, materials and finish.