General Layout - Baxi Megaflo System 15 HE Installation And Servicing Instructions

Gas fired wall mounted condensing boiler
Table of Contents

Advertisement

22
1
21
13
20
6
9
8
7
10
16
8
© Baxi Heating UK Ltd 2007
11
2
3
5
24
23
17
25

2.0 General Layout

2.1
Layout
1.
Expansion Vessel
2.
Automatic Air Vent
14
3.
Circulation Pump
4.
Drain Off Point
5.
Pressure Relief Valve
6.
Selector Switch
7.
Central Heating System Pressure Gauge
8.
PCB
9.
Control Box
10.
Gas Valve
12
11.
Condensate Trap
12.
Flame Sensing Electrode
15
13.
Spark Electrode
14.
Primary Heat Exchanger
15.
Fan Assembly
19
16.
On/Off/Reset Selector Switch
17.
Central Heating Temperature Control
18.
Calibration Control
19.
Venturi
20.
Air/Gas Collector
21.
Combustion Box Cover & Burner
22.
Igniter
23.
Burner On Light
24.
Central Heating Mode Light
25.
Display
4
18
2
1
3
0
4
bar
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents