Schedule Blocking - Nice F470 User Manual

Exhaust air
Table of Contents

Advertisement

schedule blocking

Menu
4.9.5
The compressor can be scheduled to be blocked for up to two different time
periods here.
If two settings conflict with each other a red exclamation mark is displayed
at the end of the line.
When scheduling is active the actual blocking symbol in the main menu on
the heat pump symbol is displayed.
Schedule: The period to be changed is selected here.
Activated: Scheduling for the selected period is activated here. Set times are
not affected at deactivation.
Day: Select which day or days of the week the schedule is to apply to here.
To remove the scheduling for a particular day, the time for that day must be
reset by setting the start time to the same as the stop time. If the line "all"
is used, all days in the period are set for these times.
Time period: The start and stop time for the selected day for scheduling are
selected here.
Blocking: The desired blocking is selected here.
66
Chapter 3 |
Blocking the compressor.
Blocking additional heat.
F470 – at your service
NIBE™ F470

Advertisement

Table of Contents
loading

Table of Contents