Page 3
Your dealer, your international sailing associa- We are delighted to welcome you to the great family of LAGOON boat tion or your yacht club will be very happy to recommend local sailing scho- owners and we congratulate you on it.
Page 4
The sea and the water are not the natural environment of Man and one The users of the boat are informed of the following: has to respect their laws and strength. - The entire crew must be trained properly. Adapt the use of your boat to her condition that wears out with time and - The boat shall not be loaded more with than the maximum load recom- use.
The visibility from the steering station may be obstructed in the fol- lowing conditions: - Load and load distribution. - Sea conditions, rain, spray, fog or darkness. - Lights on inside the boat. - Persons and removable equipments in the helmsman's field of vi- sibility. LAGOON 400...
In the case of low engine battery power use the battery coupling function by turning on the coupling handle located in the starboard aft cabin. Once the engines have been restarted make sure that the coupling handle is turned back to its original position. LAGOON 400...
Page 12
RMmax: Weight of vessel x d Weight of vessel: 10 tons (RMmax: Righting moment Maximum) RMmax Single-hull: 10 tons x 0,5 metres : 5 tons.metres RMmax Catamaran: 10 tons x 3 metres : 30 tons.metres Righting moment: 31.7Tm LAGOON 400...
30 cm to windward of center, the boom is slackened boat and the crew, and the manufacturer cannot be held responsible in to fly 50 cm leeward. the event of an accident. The Genoa traveler is moved slightly forward, the adjustment remains the same. LAGOON 400...
Page 14
45 m². 2 Reef: 32.48 m². 3 Reef: 20.20 m². Large gaff sail: 60.5 m². 1 Reef: 45 m². 2 Reef: 32.48 m². 3 Reef: 20.20 m². Furling genoa: 28 m². Reference 1: 21 m². Reference 2: 16 m². LAGOON 400...
Page 15
- From 28 to 33 knots: 2 Reef, 80% of the Genoa. The adjustments are mage to engines (with fixed or folding propellers). identical. DANGER Any different setting of these recommendations may result in breakage of the mast. In particular, the 100% genoa with 2 reef in the mainsail is prohibited absolutely. LAGOON 400...
Page 17
- Clip the snap shackle on the luff eyelet of reef n°3 onto the eye bolt located on the boom. - Take up the slack in the lines of reefs n°1 and 2. - Repeat steps 5 to 7 as before. LAGOON 400...
- Pay particular attention when you throw or catch the towing rope - Lead out the chain until the guy becomes taut. (it may foul on the propeller). NOTE: The stability may be reduced when you tow a boat. LAGOON 400...
Page 20
ANCHORING NAVIGATION ATTACH THE BRIDLE TO THE BRIDLE REMOTE CONTROL FORWARD BEAM OPERATION RELAY WINDLASS 12V 1000W WINDLASS CIRCUIT BREAKER - 100A Lay out of: Cockpit bench seat Chain lifter 10mm diameter Port aft cabin LAGOON 400...
Page 21
- Release the bridle from the chain. - Heave the anchor completely. - Visually check the last meters till the anchor gets into contact with the davit. - Secure the anchor or anchor chain to the cleat. LAGOON 400...
Page 22
DAVIT NAVIGATION LAY OUT OF DAVIT BLOCKERS 100A BREAKER (ELECTRIC WINCH DAVIT - OPTIONAL EQUIP- DAVIT WINCH MENT:) Lay out of: Port aft cabin LAGOON 400...
- Alternatively lower stern and bow until the tender comes into con- plantand animal life. Choose fully biodegradable cleaning products. tact with the water. Do not throw plastic bags and bin bags into the sea. Use the bins provided for this purpose at ports. LAGOON 400...
BLOCKING THE BOAT ASHORE WINTER STORAGE Positioning planks: longitudinally in bowling. - Minimum length: 2.50 m. - Minimum width: 0.30 m. - Between hull: 4.85 m. Positioning candles: under each bow. LAGOON 400...
Page 27
- Drain all the fresh water pipes and rinse them with water and vine- terization is different. gar (do not use a chlorine based product). - Lubricate and close all the water inlet valves and thru-hull fittings. Rinse and completely drain the heads bowls and pumps. LAGOON 400...
Launching RECOMMENDATIONS ..........29 STEPPING THE MAST ..........31...
Page 30
POSITION OF HOISTING CRADLE AND STRAPS 7350 5450 1900 LAUNCHING A: Engine partition B: bulkhead Mast LAGOON 400...
Page 31
- If your boat is to be fitted with sounder and speedometer, allow for the relevant fittings and their installation. A lot of skill and care is required to commission your LAGOON boat. - Check the water intake strain box for cleanliness.
Page 32
PACKING FURTHER INFORMATION RELATIVE TO THAT GIVEN IN THE GENERAL SPECIFICATIONS CHAPTER 4083 1735 LAUNCHING 11959 4850 7248 3346 1048 The measures are expressed in mm. LAGOON 400...
Page 33
- Use the backstay and lashing at the base of the mast to control the handling. - Engage the electrical harness in the mast base. - Make sure the base of the mast integrally bears on its base plate. LAGOON 400...
Page 35
Proceed by carrying out the operations recommended for stepping the mast in reverse order,taking care to mark the line locations with stickers. RECOMMENDATION Before all dismasting operation, remember to disconnect the electric cables Pull gently while guiding the cables. LAGOON 400...
- Periodically lubricate blocks, sheaves, bottle screws, winches, rails and travellers with a water-repellent grease. The LAGOON 400 is built of balsawood sandwich (monolithic below - Stainless steel that is showing small spots or blisters of rust should the water line),polyester resin and vinyl-ester; the counter-mould be cleaned and polished with a chrome and steel renovator.
Maintain the nylon, ertalon or teflon bushes only with WD40. polish. Proper settings result in gentle steering resistance,without hard points and without looseness. STORAGE To keep them properly, store the gel coat components in a cool dry and dark place. LAGOON 400...
Page 42
PUMP FOR DECK WASHING Connection (Reference 1) HULL & DECK Seawater inlet (Reference 4) Selection valve - Fresh water / Sea water (Reference 2) Switch (Reference 5) Pump for deck washing - 12V (Reference 3) LAGOON 400...
Page 43
It provides sea water or fresh water from the reservoir. A switch is located next to the electrical panel for its initiation. It is on 12 V supply as soon as the boat's power is turned on (Service battery switch). HULL & DECK LAGOON 400...
- Remove as much stain as you can with a knife blade (from the as possible with a damp rag. edge towards the centre). - Dab with a clean rag. - Remove the stain with solvent on a clean rag. Never pour the sol- vent directly over the stain. LAGOON 400...
- Do not use silicone based products. - Clean with a sponge and soapy water. - Remove ball point pen marks with methylated spirit. - Remove the grease stains with an absorbent powder (e.g. talcum powder). INTERIOR LAGOON 400...
Page 50
1. 220V socket 2. Valve - House water inlet Outlet 3. Draining valve Hot air Diesel pump Starting and temperature control Breaker Lay out of: Port aft cabin The positions are the same for the other layout version. LAGOON 400...
For use and maintenance of the material consult the manufacturer aft cabin and in the saloon at the steering station. instructions. - Adjust to the required temperature. For use and maintenance of the material consult the manufacturer instructions. LAGOON 400...
Page 52
5. Saloon Control - Air conditioning 6. Seawater pump Seawater inlet Seawater inlet 220V breaker Lay out of: Port aft locker Drainage - Sea water Drainage - Sea water Electrical panel - Inside edge Inside edge Port saloon LAGOON 400...
- Operate the air conditioning units on the electrical panel. Wait 30 seconds between the starting of each unit. - Adjust to the required temperature and ventilation on the air con- ditioning controls in the respective areas. For use and maintenance of the material consult the manufacturer instructions. LAGOON 400...
Electricity BATTERIES - BATTERY SWITCH ........ 55 BATTERY CHARGER (OPTIONAL) ......55 USE OF 12 V CIRCUIT ..........57 110 V - 220 V SYSTEM ..........59 TECHNICAL ROOM ............. 59 GENERATOR (OPTIONAL) .......... 61 INVERTER (OPTIONAL) ..........61 SHORE POWER SOCKET ..........63 MAST HARNESS ............
Page 56
Spare batteries: 2 x 140A ELECTRICITY Gel batteries (optional) Battery chargers Service: 4 x 120A Lay out of: Port aft locker Engine: 2 x 85A Power: 2 x 40A The positions are the same for the other layout version. LAGOON 400...
It can be accessed through the port engine compartment. - Turn on the charger with the circuit breaker on the electrical panel. Concerning use and maintenance of the charger refer to its instruc- tions. LAGOON 400...
Page 58
ELECTRICAL PANELS ELECTRICITY LAY OUT OF LAGOON 400...
Technical room under berth - Port aft cabin Circuit breakers Lay out of: Port aft cabin 1. Electric winch - Davit - 100A 2. Electric winch - Mainsail (classic) - 125A 3. Electric winch - Genoa - 125A LAGOON 400...
Page 60
15. Available ( x 4) 8. 12V socket 9. VHF - Hifi Lay out of: Port aft cabin Lay out of: Port aft cabin 1. SHUNT - 100A Auto pilot - (60A) 2. General fuse 12V - 100A LAGOON 400...
To access this area lift up the plate above the electrical panel in order to unclip it (2 clips), then pull it towards you to remove the plate from the end groove into which it is fitted. LAGOON 400...
Page 62
6 - Fuel supply valve. 7 - Water - Gas separator + Outlet. Seawater inlet Remote control Generator + Sea water fil- Breaker Outlet (Reference 1) (Reference 3) ter + diesel filter (Reference 5) (Reference 7) (Reference 5) LAGOON 400...
For use and maintenance of the inverter refer to its instructions. Concerning use and maintenance of the generator,refer to its ins- ELECTRICITY tructions. Selection of the supply generator: Lay out of: Cockpit locker. Lever pushed: Supply Diesel - Starboard tank Lever pulled :Supply Diesel - Port tank LAGOON 400...
Page 64
40A BREAKER Lay out of: Port aft cabin 1. Inverter 2000VA Earth-Lay out of: Control 2. 300A fuse Passageway - To port ELECTRICITY ELECTRONIC Position of elements: Lead lines Pilot elements Tiller (Reference 1) (Reference 2) (Reference 3) LAGOON 400...
- Do not modify the connections of the boat/shore supply ca- ble. RECOMMENDATION For your electrical requirements, we recommend you con- sult a specialist or our network of technicians. • ELECTRONICS PACKS (OPTIONS) Different electronics packs are offered on option. LAGOON 400...
Page 66
Lay out of: Port aft cabin 1. Washing machine 2. Ice maker 3. Water maker 4. Inverter ELECTRICITY 5. Air conditioning (See fittings chapter) MASTER SWITCH Lay out of: Technical room 1. General 2. Air conditioning 3. Electrical sockets, 220V 4. Inverter LAGOON 400...
Plumbing WATER TANKS ............67 FRESH WATER SYSTEM ..........67 GAS SYSTEM .............. 67 DRAINAGE SYSTEM ........... 69 SANITARY EQUIPMENT ..........71...
Page 68
Water heater 40L 220V Lay out of: Cockpit locker - Forward Lay out of: Port forward cabin Lay out of: Starboard aft cabin Gas: Supply valve - Gas Gas cylinder locker Position of elements (Reference 1) (Reference 2) LAGOON 400...
Page 69
NOTE: It may happen that the capacity of the fresh water tank or tanks indicated on the page "Specifications" cannot be completely used de- pending on the trim and load of the boat. LAGOON 400...
WASTE WATER SYSTEM Washbasin - Washroom Galley sink PLUMBING Shower Drain plug - Control - Shower pump Drainage: Drainage: Drainage Shower pump Starboard aft cabin Port aft cabin LAGOON 400...
Page 71
The bilge pump system is designed to drive out the water being either sea spray or leaks but absolutely not the water coming through a hole in the hull, this hole being the result of a damage. LAGOON 400...
Page 72
6 - Waste water drainage from bathroom. 8 - Sump. 9 - Drainage outlet. Electric bilge pump 12V Bilge pump system Manual bilge pump ( x 2) Operation Lay out watertight compartment Lay out of: Cockpit of: Passageway Port and starboard LAGOON 400...
Page 73
In order to avoid clogging the heads, use absorbent paper exclusi- vely. Schedule a regular rinsing through of the heads with fresh water. Close the valves after each use (in particular when the boat is unat- tended). LAGOON 400...
Page 74
Lay out of: Starboard washroom port PLUMBING Drain to sea WC - To port WC - To starboard Pump - Electric toilet + Control - Lay out of: Lay out of: Filter Electric toilet Port aft cabin Starboard forward head com- partment LAGOON 400...
Page 75
2 - Deck pump-out fitting. for engine. 3 - Vent hole. 5 - Electric pump. 6 - Vent valve on the hull. RECOMMENDATION Use the pump system at ports or marinas to empty the waste holding tanks. LAGOON 400...
Page 76
SHORE FRESHWATER SUPPLY Connection Operation: The water comes from the dock directly to the group of water. There is no water valve selec- tion of the wharf / House water. WARNING Turn off shore water before leaving the vessel. LAGOON 400...
Page 77
Water maker 110V / 220V Elements (Reference 1) PLUMBING Drainage - Sea water (Reference 3) Control panel (Reference 4) Seawater intake valve (Reference 2) Operation: Water any dessalinisateur am arriving directly at the reservoir of water. There is no gate of slection. LAGOON 400...
Page 78
PLUMBING ICE MAKER Lay out of: Cockpit Supply valve - House water Operation Lay out of: Port forward cabin Lay out of: Aft cabin PLUMBING 1. 220V breaker 2. 220V socket LAGOON 400...
Page 80
IMPLANTATION MOTORIZATION Fuel tank Deck filler Lay out of: Aft cabin - Port and starboard Capacity: 2 x 200 l ENGINE Gauge: on the electrical panel 250mA gauge fuse Lay out of: On the fuel tank LAGOON 400...
- Regularly check the O ring of the filler for good condition (in order to prevent water entries). - Do not turn off the fuel tap after each use (except in case the boat is unattended for long). - Keep the fuel tank as full as possible (to avoid condensation). LAGOON 400...
Allow to flow into a box till the fuel looks clean. Do it several times a year. Change the pre-filter at least once a year (access to it when you re- move the bowl). LAGOON 400...
Page 84
FUEL VALVE / ENGINE WATER VALVE ENGINE FUEL VALVE LOCATED ON THE FUEL TANKS ENGINE WATER VALVE VIEW INTERIOR VIEW OUTSIDE LAGOON 400...
In case of an intervention when the engine is running: - Stay away from belts and mobile parts. - Be careful with full clothes, long hair, rings etc. (you may be caught). - Wear appropriate clothes (gloves, caps etc.). LAGOON 400...
Page 86
ENGINE ENGINE ENGINE PANEL BILGE PUMP LEVER - ANODE (On hull,under water line ENGINE LAGOON 400...
The instrument panel has all the testing functions of the engine and RECOMMENDATION it does not require any special precaution (refer to engine leaflet). Ensure that the base plate anodes have good metal contact with the transmissions. Never paint the anodes. Assemble the propellers before re-launching the boat. LAGOON 400...
- The mast should remain curved towards aft. (never use the halyard snap shackle or shackle). Do not hoist a crew member when sailing in heavy weather. ADVICE: Your LAGOON dealer can carry out all the maintenance operations. LAGOON 400...
Page 92
RUNNING RIGGING RIGGING AND SAILS LAGOON 400...
Page 93
Spinnaker sheet / Gennaker sheet - To starboard Mainsail traveller pass rope - To starboard Mainsail traveller pass rope - To port Genoa sheet - To starboard Reef 3 Reef 2 Reef 1 Boom topping lift Spinnaker guy - To starboard LAGOON 400...
Page 94
Main halyard Spinnaker halyard/Gennaker (optional) Gennaker sheet (optional) 2 x 29 SHEET / Spinnaker guy (optional) Genoa halyard RIGGING AND SAILS Boom topping lift Genoa sheet 2 x 19 Mainsail sheet Traveler control line 2 x 19 Genoa furler LAGOON 400...
- Remove the drums and clean them. - Lubricate the drums with a film of white grease or Teflon to reduce the friction and fight against corrosion (this type of grease is clean, non toxic and biodegradable). LAGOON 400...
- Regularly rinse the drum and swivel. shrouds and over the jack-lines. - Lubricate the bearings if recommended by the manufacturer. - Fasten the sheet return blocks to the bolts. - Unrig the sails if your boat is not to be used for long. LAGOON 400...
Page 98
GENNAKER RIGGING AND SAILS FIXING OF THE GENNAKER HALYARD ONTO CHAIN SWIVEL TAKE-UP DRUM THE HEAD RETURN BLOCK FOR GENNAKER SHEET LAGOON 400...
Our agents' network offers you accessories that have been selected by the yard and are consistent with your needs. Have a sail maker's kit and a user's manual so that you may carry out the emergency repairs waiting for the sailmaker's assistance. LAGOON 400...
Safety SAFETY EQUIPMENT ..........101 GAS SYSTEM SAFETY INSTRUCTIONS ....103 FIGHT AGAINST FIRE ..........105 BILGE PUMP SYSTEM ..........107 EMERGENCY TILLER ..........107 CAPSIZING ............... 109 ENGINE ..............109...
Page 102
POSITION OF THE LIFERAFT SAFETY LAGOON 400...
Close the deck hatches and fore portholes each time before DANGER each trip. Some boats are equipped with a retractable ladder or remo- vable. Make sure the ladder is in place and deployed as soon as you are on board. Reduce speed in waves. LAGOON 400...
Page 104
GAS VALVES SAFETY GAS VALVES LAGOON 400...
If you detect a leak, close the valve of the cylinder and repair before you use it again. Have the repairs carried out by someone skilled. • Other locations are possible, the extinguishers shall be less than 5 m from all the berths. LAGOON 400...
Page 106
All extinguishers should be easily accessible and should be able to be reached rapidly for use,maintenance or repair without having to use tools or to remove any part of the boat including drawers and shelves. Extinguishers - Portable Emergency exit SAFETY Extinguisher aperture of the engine compartment EXTINGUISHER ACCESS HOLE The positions are the same for the other layout version. LAGOON 400...
- Fill up a tank or change a gas cylinder when an engine is Keep an extinguisher handy in case the fire should start running, a stove or heater is on. again. - Smoke while handling fuels or gas. LAGOON 400...
B i l g e p u m p s y s t e m Regularly check tension of the turnbuckles on the turnbuckles stee- • ELECTRIC BILGE PUMPS ring cables. The electric pumps for bilge,sump and engine compartment operate automatically. See PLUMBING chapter. LAGOON 400...
- The propeller blades are sharp and can cause major damage when rotating. - Never attempt to release a fishing net or line caught in the propel- ler when it is rotating. - Before setting sail,check that the propellers are working in both fore and aft positions. LAGOON 400...
The significant height of a wave is the average height of the upper rate the wave height in question. third of the waves, that approximately corresponds to the height of a wave an experienced observer can assess. Some waves will be twice as high as this value. LAGOON 400...
Sewage water capacity - by bathroom (optional)....... 80 l Battery capacity (Standard version).....2 x 140 Ah (12 V) Engine batteries ...........2 x 110 Ah (12 V) Maximum engine power............58 kW CE category Maximum number of persons A....................12 B....................14 C ....................20 D ....................20 LAGOON 400...
Page 116
TRANSMISSION SERIAL NUMBER TO STARBOARD:....ENGINE SERIAL NUMBER TO PORT:........... TRANSMISSION SERIAL NUMBER TO PORT: ......www.cata-lagoon.com 162, quai de Brazza - 33100 Bordeaux - France Tél. 33 (0) 557 80 92 80 Fax 33 (0) 557 80 92 81 E-mail : info@cata-lagoon.com...
PERSONAL NOTES ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Dealer stamp ................................The present document is not contractual and since we constantly desire to improve our models, we reserve the right to modify them without notice.
Need help?
Do you have a question about the 400 and is the answer not in the manual?
Questions and answers