Final Installation; Removing The Detector - Edwards LaserSense Nano Installation Handbook

Table of Contents

Advertisement

Chapter 2: Installation and configuration
Auto calibration
Auto calibration automatically starts a new FastLearn cycle when the detector is
powered up. This may be disabled if the previous settings need to be retained.

Final installation

Once the power and signal connections are made, place the detector cover onto
the unit and secure the cover to the unit using the cover mounting screw.
The detector is designed solely for operation with the front cover securely
Note:
fitted using the cover mounting screw.

Removing the detector

Removing the detector is the reverse of the installation process, disconnecting
the pipework and wiring connections installed in the unit.
LaserSense Nano Aspirating Smoke Detector Installers Handbook
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents