Download Print this page

EFI GTS Owner's Manual page 13

Hide thumbs Also See for GTS:

Advertisement

NOTE: Letters in (parentheses) refer to the PARTS IDENTIFIER on page 1 and/or the PARTS ASSEMBLY on page 2 Use as needed for clarification.
ADJUST RAIL ANGLE
To raise or lower the angle, stand alongside the Upper Rail (N), facing the Tower (A).
40.
When you are raising the resistance level, lift from the Curved Crossbar (O2) or Rails (K, N) and slip the
Tower Crossbar (Z) into the desired Tower Level Hook (R). The higher the Rails are on the Tower, the higher the
resistance. Once the Tower Crossbar connects with the desired Tower Level Hook, lower the Rails and make sure
that Tower Crossbar is securely seated inside Tower Level Hook.
IMPORTANT:
Be sure the Tower Crossbar is fully secured in the Tower Level Hook on both sides before use.
Always perform a visual and manual check before getting on the GTS.
41.
When you are lowering the resistance level, lift the Curved Crossbar (O2) or Rails to disengage the Tower
Crossbar from the Tower Level Hook. Push the Tower back and lower the Rails to the desired level, then release
the Tower and it will rock forward. Once the Tower Crossbar aligns with the Tower Level Hook, pull the Tower
forward and lower the Rails to ensure the Tower Crossbar is securely seated.
ATTACH & DETACH DYNAMIC ARM PULLEY CABLE SYSTEM
42.
To attach the Dynamic Arm Pulley System to the Glideboard (G) connect the snap hook to the
Glideboard "D" Ring (F).
43.
To free the Glideboard from the Dynamic Arm Pulley System, simply unfasten and release the snap hook on
the pulley, then store the center cable pulley in the Tower Pulley Pocket (C).
(W)
GTS
®
OWNER'S GUIDE
40
41
42
43
11

Advertisement

loading
Need help?

Need help?

Do you have a question about the GTS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for EFI GTS