Center
Crossover
Log
Left
Crossover
Log
Square
Peg on
Middle
Log
Round
Peg on
Front Log
Figure 20 - Installing Left, Center and
Right Crossover Logs
(Picture may vary from actual)
LVD18-PP AND LVD24-PP
1. Place rear log (#1) onto base. Holes in
bottom of log must seat over pins on base
as shown in Figure 21.
2. Place middle log (#2) onto base. Holes in
bottom of log must seat over pins on base
as shown in Figure 21.
3. Place front log (#3) onto grate as shown
in Figure 22.
Middle Log
Pin for
Hole in
Bottom
of Log
Figure 21 - Installing Rear and Middle
Logs (Picture may vary from actual)
126838-01A
INSTALLATION
Continued
Right
Crossover
Log
Square Peg
on Rear Log
Round Peg
on Center
Log
Rear Log
Round
Peg on
Middle
Log
Burner
www.SuperiorFireplaces.US.com
Grate
Figure 22 - Installing Front Log
(Picture may vary from actual)
4. Place left top log (#4) as shown in Figure
23. Match square peg on top of rear log
(#1) with square hole on bottom of left top
log (#4). Match round peg on top of middle
log (#2) with round hole on bottom of left
top log (#4).
5. Place right top log (#5) as shown in Figure
23. Match square peg on top of rear log
(#1) with square hole on bottom of right
top log (#5). Match round peg on top of
front log (#3) with round hole on bottom
of right top log (#5).
Left Top
Log
Figure 23 - Installing Left and Right Logs
(Picture may vary from actual)
Front Log
Right
Top
Log
Square Peg
on Rear Log
Round
Peg on
Front Log
17