LG GB115 Service Manual page 128

Table of Contents

Advertisement

While testing
Will accord with and test the test item by item of the script while testing, every test result will show
on List.
1.
Item: Mainly test the procedure serial number.
2.
Sub: Test the procedure serial number less importantly.
3.
Description: It is tested that the procedure proves.
4.
P/F: P means test succeeds, F means test failure.
5.
MV: Number value received in test.
6.
Unit: Unit.
7.
Output Line: Word bunch got in test.
8.
LL: The lower limits.
9.
UL: The upper limits.
10. Test Time: This tests the execution time of procedure.
Fig.22
Sketch map while testing
128

Advertisement

Table of Contents
loading

Table of Contents