Installing Enclosure Panels; Double Island Canopy Style Hoods; Installing U-Channel Strips - Accurex XB Installation, Operation And Maintenance Manual

Kitchen hoods type i and type ii
Table of Contents

Advertisement

Installing Enclosure Panels

Before installing the enclosure panels, make sure
the hood is hung in position with all the ductwork
attached and all fire system and electrical connections
completed.
1. Position the end enclosure panels on the hood, and
clamp into place with clamps provided or tack-weld
the panels into place.
2. Fasten the end enclosure panels to the wall; method
depends on wall construction. (Fasteners provided
by others).
If the hood is a double island, bolt the end enclosure
panels together. (Fasteners provided by others).
3. Position the front enclosure panel(s) on the hood,
and bolt to the end enclosure panels with the 5/16 in.
bolts provided in the hardware package.
4. Tack-weld or clamp the front enclosure panel(s)
to the hood. If clamps are used, they must be
positioned 4 in. (10.16 cm) from the ends and in the
center of the front enclosure panel.
5. To allow for ease of cleaning, caulk the external
seams with NSF Approved silicone caulk
(GE SCS1009, or its equivalent). The caulk is not
provided.
NOTE
Installation instructions may not be applicable for
concrete ceilings.
END ENSLOSURE
PANEL
ATTACH TO WALL
FASTENERS BY OTHERS
BOLT PANELS TOGETHER
WITH 5/16 INCH BOLTS
SUPPLIED BY MANUFACTURER
CLAMP PANELS TO HOOD
STANDING SEAM WITH HARDWARE
SUPPLIED BY MANUFACTURER
FRONT ENCLOSURE PANEL
END ENSLOSURE
PANEL

Double Island Canopy Style Hoods

NOTE
Before hanging the hoods, please verify the hood
marks to ensure the correct hood is hung on the
correct side.
A double island hood is created by installing two
wall style hoods back to back. Use the installation
procedure described for single island canopy hoods;
install and level both hoods. After leveling, secure the
hoods together by tack-welding and/or bolting the rear
mounting brackets together. Double island hoods may
also be provided with a U-Channel to seal the seam
between the two hoods.
Installing U-Channel Strip
1. After the hood is hung in position and leveled, apply
caulk to the inside edge of the double island clip.
2. Position and install the clip by tapping into position
along clip (friction fit).
3. Caulk edges to seal out grease and allow for ease
of cleaning. Caulk with NSF Approved silicone caulk
(GE SCS1009 or its equivalent). The caulk is not
provided.
DOUBLE ISLAND CLIP
Kitchen Hoods • Type I and Type II
HOOD-1A
HOOD-1B
SILICONE CAULK
(GE SCS1009)
DOUBLE ISLAND CLIP
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents