May 16, 2025

SB-175 lights are sequentially flashing. Only the right side is lit up and is solid not flashing.

1 comments:
Mr. Anderson
May 22, 2025

When the ScaleBlaster SB-175 lights are sequentially flashing and only the right side light is solid, it means the system is operating correctly. The solid green light on the far right indicates power is on, and the oscillating lights show the system is active.

This answer is automatically generated

Subscribe to Our Youtube Channel

Summary of Contents for ScaleBlaster SB-175

  • Page 1 SB-175 Installation & Operation Manual Residential Unit • Indoor/Outdoor Installation...
  • Page 2 IDENTIFY THE SB-175 COMPONENTS Your new ScaleBlaster SB-175 unit includes the following components: 1.) One (1) SB-175 power unit that works on 115VAC or 230VAC automatically. If 230VAC is desired, replace plug. This unit comes with a 5 foot power cord.
  • Page 3: Before You Start Installing

    Well Water Installation For customers that are on a private well, the best place to install the ScaleBlaster unit is after the well’s pressure tank. If that is not possible, the ScaleBlaster unit can be installed prior to the pressure tank.
  • Page 4 LOCATION OF THE SB-175 UNIT 1.) The most desirable place to install the unit is on the main water line that enters the house. 2.) The power unit should be mounted on a wall or other solid surface within five feet from an electrical outlet and within ten feet from where the pipe will be wrapped.
  • Page 5: Mounting The Power Unit

    MOUNTING THE POWER UNIT The unit can be mounted indoors or outdoors in an upright vertical position on a wall or other non-enclosed area. NOTICE: If mounting the power unit outside, it must be kept out of the direct sunlight. The installer must supply the mounting screws for the type of surface the unit will be mounted on.
  • Page 6 3.) Wrap one of the cable ties tightly so that the signal cable is secured to the pipe. (Figure A) Straight section of pipe away from angles, tees, valves and couplings Figure A Balance of ScaleBlaster signal cable to power Cable Tie box terminal 4.) Wrap the loose end of the signal cable securely around the pipe - in any one direction –...
  • Page 7: Activating The System

    2.) The LED light on the front panel should light up. 3.) Operation of the ScaleBlaster SB-175 system can be confirmed by observing the illumination of the LED indicator located on the face of the power unit. Power on - green light on far right side will stay lit (Figure E).
  • Page 8 A 5 year extended warranty is available on this unit at a very minimal cost. 120-DAY MONEY-BACK GUARANTEE We are so sure you will be satisfied with ScaleBlaster, we are offering a 120-day money back guarantee from the date of purchase if you are not 100% satisfied with the product.