ScaleBlaster SB-75 Installation & Operation Manual

ScaleBlaster SB-75 Installation & Operation Manual

Water conditioner

Advertisement

Quick Links

The eco-friendly solution to hard water
SB-75
Installation & Operation Manual
Residential Use • Indoor Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SB-75 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ScaleBlaster SB-75

  • Page 1 The eco-friendly solution to hard water SB-75 Installation & Operation Manual Residential Use • Indoor Installation...
  • Page 2 IDENTIFY THE SB-75 COMPONENTS Your new ScaleBlaster SB-75 unit includes the following components: 1.) One (1) SB-75 power unit (for indoor installations only) 2.) One (1) AC adapter - 120 volt class, UL approved transformer with 5- volt DC output, use only Clearwater Enviro Tech part # CET-0978 3.) Signal Cable (46’) and four (4) nylon...
  • Page 3 Well Water Installation For customers that are on a private well, the best place to install the ScaleBlaster unit is after the well’s pressure tank. If that is not possible, the ScaleBlaster unit can be installed prior to the pressure tank.
  • Page 4 LOCATION OF THE SB-75 UNIT 1.) The most desirable place to install the unit is on the main water line that enters the house. 2.) The power unit should be mounted on a wall or other solid surface within five feet from an electrical outlet and within ten feet from where the pipe will be wrapped.
  • Page 5 MOUNTING THE POWER UNIT The unit must be mounted indoors in an upright vertical position on a wall or other non-enclosed area. The picture below shows the location of the mounting holes. The installer must supply the mounting screws for the type of surface the unit will be mounted on.
  • Page 6 3.) Wrap one of the cable ties tightly so that the signal cable is secured to the pipe. (Figure A) Straight section of pipe away from angles, tees, valves and couplings Figure A Balance of ScaleBlaster signal cable to power Cable Tie box terminal 4.) Wrap the loose end of the signal cable securely around the pipe - in any one direction –...
  • Page 7 2.) Plug in the transformer end of the cord into a 110-volt electrical outlet. 3.) Operation of the ScaleBlaster SB-75 system can be confirmed by observing the illumination of the LED indicator located on the face of the power unit. Power on - green light on far right side will stay lit (Figure E).
  • Page 8 A 2 year extended warranty is available on this unit at a very minimal cost. 120-DAY MONEY-BACK GUARANTEE We are so sure you will be satisfied with ScaleBlaster, we are offering a 120-day money back guarantee from the date of purchase if you are not 100% satisfied with the product.

Table of Contents