CMO Operations & Logistics
Training and Vendor Development
Multimedia Creation & Support
7. Note the correct positioning of the alignment tab.
9. Tighten the screws with the correct torque.
11. Red marks on the Coax Cables must be visible.
Service Manual N92 RM-100
Page
23
(53)
CONFIDENTIAL
8. Insert two new screws.
10. Ensure that the cables are positioned as shown.
Copyright © 2006 NOKIA Corporation. All rights reserved.
Approved 1.0
MGR
17.Okt.2006