Download Print this page

Sears C260-21501 Service Information page 3

Washer spin dryer

Advertisement

-2-
III.
TIIIffi
A.
Testing
The tiner
can be tested
in the rnachine.
1.
Disconnect all wires frcm the tirner terminals.
Refer to the wiring
diagram.
2.
With the timer control
lorob in the rrwash" area,
test between terminals
A & B (wash nrctor circuit)
and A & C (spin nntor circuit).
Circuit
should
be cmplete.
3.
With the timer control
Imob in the "drain"
area,
test between terminals
A & C,
Circuit
should be
canplete.
4.
Ttre tinrer nptor can be tested with an ohm meter
to the clock terminals.
a.
A resistance
reading would indicate
a good
timer.
b.
A corplete
circuit
or no circuit
would
indicate
a defective
tiner
rnotor.
B.
leplacenent
1.
Rernrve all
wiring
frcn tiner.
2.
Bernrve retainer
frcrn control
shaft
and slide
enntrol
shaft off.
3.
Rernove four screws securing timer bracket
to
outer she1l and remove tiner
and bracket.
4.
Renrove two screws securing tirner bracket
and
skirt
to timer.
ry.
SPINNER LID SI{ITCTI
A.
Creneral
Ttre lid
srpitch is secured to the upper left
hand corner
of the shelt
and is operated by a rod connected to the
spin lid
hinge.
The rod actuates the lid
switch when
the spin lid
is closed.
ltris
stdtch
also controls
the
circuit
for the electric
brake.
T . F . 2 6 - 2 2

Advertisement

loading