LG LZ-H0106BA0 Service Manual page 19

Ventilation system
Hide thumbs Also See for LZ-H0106BA0:
Table of Contents

Advertisement

In case of service, operate through inspecting tool(hole) installed on the surface of ceiling.
For main part disassembly, follow the instructions below.
Models: LZ-H0506BA0 / LZ-H0502BA0
Control Box
• Unscrew the control box cover, and disassemble.
Total Heat Exchanger, Filter
• Take the Maintenance Cover off, and take them out. (in
case that the Maintenance Cover is screwed up,
unscrew it first.)
• Be careful of sharp area when taking the Air Filter out.
• Be careful not to drop the Total Heat Exchanger from
the main body when detaching.
Fan
• Take the fan out after taking the Maintenance Cover off.
(in case that the Maintenance Cover is screwed up,
unscrew it first.)
• Be careful of sharp area when taking the fan out.
How to disassemble
Control box cover
Screw
Maintenance Cover
Main body
Main body
Service Manual 19

Advertisement

Table of Contents
loading

Table of Contents