Test Procedures - Infinity ENTRA SUB TWO Service Manual

Powered subwoofer
Hide thumbs Also See for ENTRA SUB TWO:
Table of Contents

Advertisement

Entra Sub Two
A. Power Amp Section
Resistance
Check
2. Power Up LED RED
With a 5mV signal to Low level input, LED should change to GREEN
-Voltage measurements (DVM)
LED
RED
GREEN
3. D.C. Operation
-Voltage measurements (DVM) on CLASS D POWER AMP
Between
And This
Point
Get this
71.7V
Reading
4. Check Switching Frequency
·
Oscilloscope - USE THE PROBE TIP TO U6(7) TO GND
·
Reading 100kHz +/-10%,24Vp-p
B. Pre Amp Section
Line Level Input Sensitivity
-Set up
ENTRA SUB II TESTING PROCEDURE
Resistance from S+ (SPK O/P) to GND should be >1M W (NO LOAD)
Resistance from V+ (C6 P+) to V- (C8 P-) gradually Fully CHARGED should read >10k W
Resistance from V+ (C6 P+) to S+ (SPK O/P) should read >1MW
Resistance from V- (C8 P-) to S+ (SPK O/P) should read >1M W
OP AMP
P-U4(1)
0Vrms
7.13Vrms
V+
Q4(E)
Q1(C)
GND
V-
GND
0V
-71.7V
Turn level, X'OVER FREQ POT Fully CW and LFE switch off
Generator Set at 200mV@50Hz
Signal to Line level input
P-U4(7)
11.84VDC
-12.93VDC
Q10(C)
U7(1)
U7(2)
GND
GND
GND
0V
-71.7V
-71.5V
10
U7(4)
U7(6)
U7(7)
GND
GND
GND
-71.2V
0V
0V
U7(8)
GND
4.65V

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ENTRA SUB TWO and is the answer not in the manual?

Questions and answers

Table of Contents