Toshiba Satellite P500 Maintenance Manual page 117

Hide thumbs Also See for Satellite P500:
Table of Contents

Advertisement

Test Program for Field.
Test Process:
1. Checks the memory size to determine the maximum size of installed
2. Tests memory addresses 0 to the maximum installed.
3. Writes, reads, and compares test data after a memory refresh cycle
NOTE: There may be a short delay between write and read operations,
depending on the memory size.
Subtest 05
Stress Test
This subtest writes the following 16KB data patterns to the Write/Read Buffer
in conventional memory.
data:
Satellite P500 and Satellite Pro P500 Tests and Diagnostics Manual
memory.
(16ms or more).
FFFFFFFFFFFFFFFF0000000000000000
5555555555555555AAAAAAAAAAAAAAAA
CCCCCCCCCCCCCCCC3333333333333333
0000000000000000FFFFFFFFFFFFFFFF
AAAAAAAAAAAAAAAA5555555555555555
3333333333333333CCCCCCCCCCCCCCCC
FFFFFFFFFFFFFFFF0000000000000000
0000000000000000FFFFFFFFFFFFFFFF
5555555555555555AAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAA5555555555555555
CCCCCCCCCCCCCCCC3333333333333333
3333333333333333CCCCCCCCCCCCCCCC
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite pro500

Table of Contents