Download Print this page

CUSHCRAFT A4S Assembly And Installation Instructions Manual page 5

20 / 15 / 10 meterbeam

Advertisement

KEY
P/N
DISPLAY
118
010118
119
010119
156
190156
405
010405
FIGURE D
TC
Important: Drain holes in traps
should all be facing the ground
TC
TB
FIGURE E
405
Boom
156
118
119
118
FIGURE G
DESC
SIZE
SS HEX
5/16"
NUT
(.8 cm)
SS LOCK
5/16"
WASHER
(.8 cm)
ALUMINUM
2" X 1-1/8"
BRACKET
(5.08 X 2.86 cm)
U-BOLT
2-1/8" x 4"
(5.4 x 10.2cm)
2"
(5.1 cm)
TD
TE
Element
119
ELEMENT
A4S
#3 - ELEMENT MOUNTING
QTY
8
Attach elements according to Figures E and F. Check all dimensions
for proper placement of elements on the boom. Level the elements
8
and tighten all the nuts on the U-bolts that hold the elements on the
boom. See Figure G for fine tuning the level of the elements. Check
all traps to make sure that the arrows are pointed towards the boom
4
and the drain holes are facing the ground so that moisture will not
build up in the traps.
4
108"
(2.73m)
TD
TE
FIGURE F
405
BOOM
BOOM
156
119
118
5
TC
(102.8 cm)
TC
(240.0 cm)
TB
ELEMENT
95
ELEMENT
40 "
1
2
1
76 "
2
(194.3 cm)
1
94 "
2

Advertisement

loading