Tarm Biomass Bonus Plus 30 Installation And Operation Manual

Wood-fired central heating boiler
Table of Contents

Advertisement

Quick Links

Bonus Plus
Model 30
Wood-fired central heating boiler
Installation and Operations Manual
Report #236-S-09-2
UL 2523-2009 (R2013) "Solid Fuel-Fired Hydronic Heating Appliances, Water Heaters, and Boilers."
Bonus Plus Instructions
Tarm Biomass
1-800-782-9927
Version 11/14

Advertisement

Table of Contents
loading

Summary of Contents for Tarm Biomass Bonus Plus 30

  • Page 1 Bonus Plus Model 30 Wood-fired central heating boiler Installation and Operations Manual Report #236-S-09-2 UL 2523-2009 (R2013) “Solid Fuel-Fired Hydronic Heating Appliances, Water Heaters, and Boilers.” Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14...
  • Page 3: Table Of Contents

    3.4.6 Expansion Tank ....................21 3.4.7 Pump Size ......................21 3.4.8 Installing the Circulator Aquastat ..............21 3.4.9 Installing the Overheat Aquastat ................ 22 3.4.10 Installing the 339N Probe Thermometer ............23 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 3...
  • Page 4 7.1 HS-Tarm Bonus Plus Wood Boiler Warranty ............47 8.0 Installation Report for Boiler System ................49 Appendix A-Temperature Conversion ................50 Appendix B- Contact Information ..................51 Appendix C– Quick Start Guide ..................52 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 4...
  • Page 5: Introduction

    European design, craftsmanship and attention to detail, results in a long lasting boiler with un- matched fit and finish. With proper installation, operation and maintenance your Tarm Biomass Bonus Plus log wood boiler will provide years of safe, dependable, economic and earth friendly heating.
  • Page 6 Tarm Biomass. Please read the literature enclosed by the manufacturer regarding the various accessory devices. These devices are warranted by the manufacturer, NOT BY Tarm Biomass These accessory devices must be installed and used according to the recommendations of the manufacturer.
  • Page 7: Product Description And Requirements For Safe Operation

    4. Primary Air Adjustment 12. Primary Air Injection 5. Secondary Air Adjustment 13. Flue Collar 6. Ash Door 14. Induced Draft Fan 7. Sight Glass 15. Cleanout Cover 8. Gasification Tunnel Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 7...
  • Page 8: Boiler Control Panel

    Combustion can be monitored through the sight glass (7). Chimney connector is attached to the flue collar (13). The clean-out cover (15) is detachable and allows access for cleaning the heat exchanger pipes. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 8...
  • Page 9: Description Of Burn Process

    Operation of the fan assumes that the boiler can discharge its heat continually. The Bonus Plus must always be connected to a buffer tank of adequate size (see page 53) Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 9...
  • Page 10: Safety Systems

    The valve must be a Termovar Model 4440A-3, Lk810 or equivalent with a 72 ºC element. Tarm Biomass provides this valve at an extra cost. A flue thermometer (Part #339N) is highly recommended to help monitor the performance of the Bonus Plus.
  • Page 11: Boiler Fabrication And Testing

    Excessively small and compact pieces of wood or wood pellets are not suitable. Coal cannot be used as it becomes too compact and closes the combustion slot. The firebox can be filled to the top. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 11...
  • Page 12 The wood will dry out most quickly if it is cut into the appropriate length and split into pieces 4”- 6” (100-120mm) thick. The best length is 20” (0.5 m) for the Bonus Plus 30. The wood is best stored in the open air under cover.
  • Page 13: Building Requirements

    Revision of existing heating system piping may be appropriate to properly utilize the equip- ment. Although Tarm Biomass can provide advice and design detail on the integration of this boiler with the heating system of the building, the ultimate responsibility for the performance of the system rests with the installer.
  • Page 14: Boiler Installation And Start-Up

    It is critical to size the boiler properly. A proper, up to date heat load calculation is advised. An accu- rate history of building fuel usage over several years can help to calculate the proper size boiler. Boiler sizing is the responsibility of the installer. Tarm Biomass bears no responsibility for boiler sizing, but can provide sizing input.
  • Page 15 D-Minimum Clearance to Combustibles Inches E-Minimum Clearance to Combustibles Inches F-Minimum Distance for Combustibles to Pipe Inches G-Maximum Distance for Flue Pipe Feet H-Ideal Location for Draft Regulator (Barometric Damper) Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 15...
  • Page 16: Plumbing And Mechanical

    CAUTION ☼ Any plastic or rubber tubing used with a Tarm Biomass boiler must have an oxygen barrier, or boiler corrosion will occur. If radiant tubing without an oxygen barrier is installed, water in the tubing part of the heating system must be separated from the boiler. Separation of system com- ponents is typically done by using a heat exchanger.
  • Page 17: Electrical

    10 feet (3.0 m) measured horizontally. For the Bonus Plus 30 best draft will be provided by a chimney which has an 6” (152mm) ID round flue, is 20-30 feet (6.0-9.0m) in height and which is located inside the heated structure. The chimney must be capable of maintaining a breech draft of -0.05”...
  • Page 18 -0.05” (1.25 mm) of water column, a second draft regulator may be required.  Recommended draft regulator location (1) is shown in Fig 3.1. Fig 3.1 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 18...
  • Page 19: Outside Combustion Air

    To move the unit into the boiler room the lift ring on the top of the boiler can be used. To move the boiler around the inside of the boiler room rollers can be used under the boiler. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 19...
  • Page 20: Temporary Storage

    NFPA 211.  The chimney connection pipe must be placed over the outside of the boiler’s flue gas exhaust pipe. A flue collar adaptor is available from Tarm Biomass. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14...
  • Page 21: Safety Plumbing

    Do not use self contained, non electric zone valves in the zone controlled by the overheat control! Such valves would prevent the overheat control system from the cooling the boiler when necessary. NOTE THE THERMAL STORAGE SYSTEM MAY NOT BE USED AS A DUMP ZONE! Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 21...
  • Page 22: System Plumbing

    There are numerous possibilities for connecting your Bonus Plus and thermal storage system to your home heating system. Tarm Biomass provides diagrams as concept diagrams only. Final design, in- stallation, and code compliance details are the responsibility of the designer/installer of the system.
  • Page 23: Installing The Overheat Aquastat

    Remove the existing sen- sor well. Replace with new ½” sensor well. The bulb for the Honeywell L4008B over- heat aquastat can now be installed. Top panel can also be re-installed. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 23...
  • Page 24: Installing The 339N Probe Thermometer

    # 1040705), must be installed as shown in Fig. 3.10. A 1” nipple, 1”X ¾”X 1” tee and 1”X¼” reducer is provided to ease operation. Follow applicable codes. Installed relief valve and temperature/pressure indicator. Fig. 3.10 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 24...
  • Page 25: Filling And Venting

    The system should be pressure tested before being placed into service. NOTE If water quality is poor or PH unsatisfactory, the installer should consider water treatment ad- ditives during filling and water testing as part of annual maintenance. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 25...
  • Page 26: Boiler Operation, Maintenance, And Service

    (I) Lo-Limit Thermostat. The Lo-Limit Thermostat switches off the fan when the wood has burned out. It is set to 90 °C. Minor adjustments can be made to adjust how many coals are left after the burn cycle. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 26...
  • Page 27 This will cause unnecessary, and potentially damaging, creosote build-up in the boiler and is to be avoided. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 27...
  • Page 28 A 4 MM Hex wrench is necessary to fit/unfit the screw (screw high- lighted in orange at left) Fig. 4.6 Fig. 4.5 Door Locked Door Unlocked Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 28...
  • Page 29: Items To Check Before Using

    Standby time and starting/stopping of the fan do not give clean combustion. Furthermore, con- densation will occur in the filling chamber, causing corrosion in the steel walls. Excessive standby operation can also damage combustion aprons. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 29...
  • Page 30: Adding Wood To An Already Established Fire

    4.7 Operation with Thermal Storage System Tarm Biomass requires that the Bonus Plus be permanently connected to a Thermal Storage System. The boiler will always be able to discharge its heat resulting in better combustion, less depositing of soot and tar, and longer boiler life.
  • Page 31: Creosote

    The flame is too long reaches the edge of the blue-tinged: reduce the and orange / reddish: in- tunnel stone and is yellow secondary air. crease the secondary air. and light blue-tinged. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 31...
  • Page 32: Cleaning And Maintenance

    Other waste should not be placed in this container. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 32...
  • Page 33 Neglected maintenance will result in premature wear of the ceramic pieces, irreparable deforma- tion of the firebox aprons and excessive clogging of air passages. Fig. 4.11 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 33...
  • Page 34 Be aware that the hotter the fire, the less creosote is deposited, and that weekly cleanings may be necessary in mild weather, even though monthly cleanings may be enough in the coldest months. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 34...
  • Page 35: Cleaning The Induction Fan

    Please inspect the draft fan carefully – even a thin coating of ash significantly reduces the air flow and must be removed. NOTE If the fan motor is blocked because of lack of cleaning, the motor can be damaged. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 35...
  • Page 36 Boiler Operation, Maintenance, and Service > Cleaning and Maintenance Loosen Nuts 8mm x 4 Fig. 4.14 Clean the fan blades, fan housing. Fig. 4.15 Clean the flue gas sensor well (pipe) located in the fan housing. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 36...
  • Page 37: Maintaining Door Seals

    3. Check the primary air ventilation holes (Fig.4.11) for unobstructed airflow. 4. If necessary, clean the openings and air channels. Fig. 4.11 Primary Air Ventilation Holes Fig. 4.10 Firebox Aprons Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 37...
  • Page 38 To minimize this damage and extend the life of the aprons, avoid long exposure to deep ember beds. Ideally the boiler should not be re-fuelled until only a small ember bed remains in the boiler or the fire has burned out. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 38...
  • Page 39: Smoke Pipe Inspection And Cleaning

    Chimney fires can be avoided by following the recommendations in this manual for minimizing ash formation, by maintaining your chimney in good condition, and by cleaning your chimney regularly. A chimney fire should never happen with a Bonus Plus boiler. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 39...
  • Page 40: Checking The Barometric Damper

    The fan needs to be able to operate to remove combustible gasses. It is good practice to close the primary and secondary air dampers (move the dials counter-clockwise to first position). Remember to open the dampers before the next firing. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 40...
  • Page 41: Troubleshooting

    If it is too low, the wood is probably not suitable. Try with a different type of wood or different lot. The fuel Test the moisture content of the wood with a moisture meter. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 41...
  • Page 42 Check the electrical fuse panel. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 42...
  • Page 43: Data And Drawings

    9. Flue Gas Temperature Sensor Well inches ¼ 10 Drain/Fill Connection inches ½ 11 Flue Pipe, External Diameter inches B1 Measurement inches 21¼ B2 Measurement inches B3 Measurement inches B4 Measurement inches Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 43...
  • Page 44: Positioning Data

    D-Minimum Clearance to Combustibles inches E-Minimum Clearance to Combustibles inches F-Minimum Distance for Combustibles to Pipe inches G-Maximum Distance for Flue Pipe feet H-Ideal Location for Draft Regulator (Barometric Damper) Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 44...
  • Page 45: Specification Data

    Minimum Boiler Loop size inches 1¼ Fill/Drain Valve Size inches ½” Mixing Valve Opening Setting Fº Internal Overheat Aquastat Setting Fº *6” with flue collar adaptor. Specifications subject to change. Fig. 6.2 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 45...
  • Page 46: Electrical Diagrams

    Data and Drawings > Electrical Diagrams 6.4 Electrical Diagrams 6.4.1 Wiring Diagram A (Boiler Circuit Ladder Diagram) Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 46...
  • Page 47: Circulator And Overheat Aquastat Wiring Connections

    Data and Drawings > Electrical Diagrams 6.4.2 Circulator and Overheat Aquastat Wiring Connections C-3 Circulator Connections Overheat Aquastat Connections Suggested Wiring Layout Incoming Power L6006A Junction Aquastat Mount Over Round Knockouts Circulator Power Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 47...
  • Page 48: Warranty Information

    During the first five years of the warranty period Tarm Biomass will pay for all required labor at the usual and customary rate paid by Tarm Biomass for similar labor performed in Lyme, NH, and provide or pay the cost of all materials for the re- pair of the warranted unit.
  • Page 49 ABILITY, OR ANY OTHER THEORY OF LAW, ALL SUCH DAMAGES AND CLAIMS BEING SPECIFICALLY DIS- CLAIMED. Tarm Biomass’ limited warranty is void if a Tarm Biomass product is installed by someone other than a quali- fied contractor whose principal occupation is the sale or installation of plumbing and heating equipment, or if the original purchaser fails to have the boiler serviced or inspected at least once every two years by an experienced and qualified service person.
  • Page 50: Installation Report For Boiler System

    Warranty Certificate Filled and Sent: _________________________________ Date Measured and Adjusted Values Date Date Date Date Fuel Type Fuel Moisture Content Secondary Air Setting Primary Air Setting Pump Speed (C-3) Other Data/Adjustments Setting Done By: Signature Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 50...
  • Page 51: Appendix A-Temperature Conversion

    Temperature Conversion Table °C °F °C °F °C °F °C °F 179.6 183.2 125.6 186.8 129.2 190.4 132.8 136.4 197.6 201.2 143.6 204.8 147.2 208.4 150.8 154.4 161.6 165.2 168.8 172.4 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 51...
  • Page 52: Appendix B- Contact Information

    HS Tarm A/S Smedevej 2 Tarm Denmark PHONE +45 9737 1511 E-MAIL info@hstarm.dk www.hstarm.dk Importer Tarm Biomass 4 Britton Lane Lyme, NH 03768 PHONE 800 782 9927 E-MAIL info@woodboilers.com www.woodboilers.com Local Dealer Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 52...
  • Page 53: Appendix C- Quick Start Guide

    Add crumpled more kindling. with kindling. newspaper. Leave upper door cracked. How much fuel? Adjust air supply. Wait for kindling to catch fire See next page. See next page. completely. Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 53...
  • Page 54 Hard wood (e.g. Oak) < 20 % moisture Soft wood (e.g. spruce) < 20 % moisture 25 – 50 % 50 – 100 % Secondary air (lower damper): Too little Correct Too much Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 54...
  • Page 55 Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 55...

Table of Contents