Tarm Biomass SOLO INNOVA 30 Installation And Operation Manual

Tarm Biomass SOLO INNOVA 30 Installation And Operation Manual

Wood-fired central heating boiler
Table of Contents

Advertisement

Quick Links

SOLO INNOVA
Models 30 and 50
Wood-fired central heating boiler
Installation and Operations Manual
236-0-05-2
UL 391-2006 "Standard for Safety for Solid-Fuel and Combination-Fuel Central and Supplementary Furnaces."
Solo Innova Instructions
1-800-782-9927
Version 01-18
Tarm Biomass · 4 Britton Lane · Lyme, NH 03768

Advertisement

Table of Contents
loading

Summary of Contents for Tarm Biomass SOLO INNOVA 30

  • Page 1 Models 30 and 50 Wood-fired central heating boiler Installation and Operations Manual 236-0-05-2 UL 391-2006 “Standard for Safety for Solid-Fuel and Combination-Fuel Central and Supplementary Furnaces.” Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 2: Table Of Contents

    3.4.3 System Plumbing.……………………..…………………….………..27 3.4.4 Pipe Connection-Choice of Material...…………………………………28 3.4.5 Immersion Tubes and Wells……………………………………………28 3.4.6 Expansion Tank………………………………………………………...28 3.4.7 Pump Size………………………………………………………………28 3.4.8 Installing the 339N Probe Thermometer.……………………………….28 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 3: Section Page

    4.11.11 Check for Creosote.……………………………...………………….47 4.11.12 Seasonal Shutdown Procedure.……………………………………..47 4.11.13 Checking the Pressure Relief Valve……………………………...…47 4.11.14 Checking System Pressure.…………………………………...……..47 4.11.15 Heat Storage System Maintenance.…………………………………47 4.12 Power Outages.…………………………………………………………...…….47 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 4 6.5.1 Solo Innova 30 Parts List..……………………………………………...56 6.5.2 Solo Innova 50 Parts List..……………………………………………...57 7.0 Warranty Information..………………………………………………………………..58 7.1 Warranty..…………………………………………………..…………………….58 8.0 Installation Report for Boiler System..………………………………………………...60 Appendix A-Temperature Conversion..…………………………………………………...61 Notes..…………………………………………………………………….…………………..62 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 5: Introduction

    European design, craftsmanship and attention to detail, results in a long lasting boiler with un- matched fit and finish. With proper installation, operation and maintenance your Tarm Biomass Solo Innova log wood boiler will provide years of safe, dependable, economic and earth friendly heating.
  • Page 6 Tarm Biomass. Please read the literature enclosed by the manufacturer regarding the various accessory devices. These devices are warranted by the manufacturer, NOT BY Tarm Biomass These accessory devices must be installed and used according to the recommendations of the manufacturer.
  • Page 7: Product Description And Requirements For Safe Operation

    10. Boiler Serial Number Plate Secondary Air Control 11. Flue Gas Turbulators Ash Door 12. Heat Exchanger Pipes Sight Glass 13. Firebox Exhaust Stack 14. Gasification Tunnel Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 8: Boiler Fabrication And Testing

    Chimney connector is attached to the exhaust stack (7). The clean-out cover (8) is detachable and allows access for cleaning the heat exchanger pipes. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 9: Description Of Burn Process

    The stones allow the combination of exhaust gasses and secondary air to reach very high temperatures while isolated from the quenching affect of the wa- ter jacket. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 10: Safety Systems

    Biomass provides this valve at an extra cost. A flue thermometer (Part #3339N) is highly recommended to help monitor the performance of the Solo Innova. This part is available from Tarm Biomass . A Thermal Storage System is available from Tarm Biomass.
  • Page 11 The wood will dry out most quickly if it is cut into the appropriate length and split into pieces 4”- 5” (100-120mm) thick. The best length is 20” (0.5 m) for the Solo Innova 30 and 50. The wood is best stored in the open air under cover.
  • Page 12: Building Requirements

    Revision of existing heating system piping may be appropriate to properly utilize the equip- ment. Although Tarm Biomass can provide advice and design detail on the integration of this boiler with the heating system of the building, the ultimate responsibility for the performance of the system rests with the installer.
  • Page 13: Boiler Installation And Startup

    It is critical to size the boiler properly. A proper, up to date heat load calculation is advised. An accu- rate history of building fuel usage over several years can help to calculate the proper size boiler. Boiler sizing is the responsibility of the installer. Tarm Biomass bears no responsibility for boiler sizing, but can provide sizing input.
  • Page 14 D-Front of Appliance 36” Required Distance for Cleaning the Boiler. E-Ceiling to Appliance 24” Required Distance for Cleaning the Boiler. F-Combustibles to Pipe 18” Minimum Distance Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 15: Plumbing And Mechanical

    CAUTION ☼ Any plastic or rubber tubing used with a Tarm Biomass boiler must have an oxygen barrier, or boiler corrosion will occur. If radiant tubing without an oxygen barrier is installed, water in the tubing part of the heating system must be separated from the boiler. Separation of system com- ponents is typically done by using a heat exchanger.
  • Page 16: Electrical

    10 feet (3.0 m) measured horizontally. For the Solo Innova 30 and 50 best draft will be provided by a chimney which has an 6” (152mm) ID round flue, is 20-30 feet (6.0-9.0m) in height and which is located inside the heated structure. The chimney must be capable of maintaining a breech draft of -0.05”...
  • Page 17 18" Clearance from smoke pipe to all combustibles ¼" per ft Examples of Barometric Dampers Fig 3.2 Min. 16" above the base of the chimney Fig 3.1 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 18: Outside Combustion Air

    To move the unit into the boiler room the lift ring on the top of the boiler can be used. To move the boiler around the inside of the boiler room rollers can be used under the boiler. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 19: Boiler Checklist

    Cover Plate-Top Rear Clean-Out Cover Control Panel Please contact your dealer or Tarm Biomass immediately if any of the above items are missing! Tarm Biomass reserves the right to substitute equivalent equipment for any of the accessories listed above. Solo Innova Instructions...
  • Page 20: Temporary Storage

    Remove the appropriate jacket knockouts as shown on Fig. 3.3. Located on Right or Left Side Fig 3.3 Pressure Relief Valve Knockout Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 21: Boiler Assembly

    Bare Boiler Mount Fan Housing Install Front Panel Remove Coil Plate on Either the Right or Left Side and Install Pressure Relief Valve Flange Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 22 Boiler Installation & Start-up > Setting the Boiler Install Front Panel Mounting Hang Left Panel Bolt and Washer Install Left Front Corner Zip Strip Hang Right Panel Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 23 This shows the back panel with the con- nector panel removed. Mount the new electrical box over the connec- tor slot. Fish the connector wires through the slot. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 24 Place Upper Rear Panel into Place Place Rear Panel into Place (Electrical box not shown) Install Right Rear Corner Zip Strip Install Left Rear Corner Zip Strip Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 25 Leave Fan Wire Hanging in Front of In Side Wire Channel Front Panel Remove Insulation for Lo-Limit Temperature Probe on Fan Insulation Box Install Ground Wire for Control Panel Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 26 Install Fan Insulation Box Install Supply Pipe Assembly. It can be Installed on the Right or Left Hand Side. Remove Supply Pipe Assembly from Boiler Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 27 Install 3 Control Panel Sensors into Port #23. Make sure they are pushed all the way to bottom. Install Insulation on back of top panel. Install Cover Plate Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 28 Boiler Installation & Start-up > Setting the Boiler Plug-in supply and Control Plugs. Install Top Cover Control Power Feed Plug Control Panel Connections Fasten Control Panel Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 29 Opening. Bend the 4 tabs on the Cover in the Downward Position Install Ash Shelf below the Load Door Place Fan Gasket on Housing Completed Boiler Mount Fan on Housing Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 30: Connections To The Boiler

    A barometric regulator (draft damper), if used, should be incorporated into the connector (Refer to page 13 for more information). Fig. 3.4 Flue Gas Exhaust Pipe Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 31: Safety Plumbing

    There are numerous possibilities for connecting your Solo Innova and thermal storage system to your home heating system. Tarm Biomass provides diagrams (located in appendix) as concept diagrams only. Final design, installation, and code compliance details are the responsibility of the designer/ installer of the system.
  • Page 32: Pipe Connection-Choice Of Material

    If boiler operations have been producing consistent temperatures and the flue temperature has been creeping upward, this is an indication that it is time to clean the heat exchange tubes by brushing. Fig. 3.5 339N Thermometer Installed Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 33: Control Logic

    Port 2 of the Termovar and back to the boiler. Tarm Biomass recommends the use of the BLTCONTROL (available through Tarm Biomass) where the Solo Innova boiler is used with another backup boiler. BLTCONTROL is a three position control that allows switching between wood only, wood with automatic back-up, or back-up only, by control- ling the operation of the back-up auxiliary boiler.
  • Page 34 Boiler Installation & Start-up > Connections to the Boiler Tarm Biomass recommends the use of an additional Termovar valve model 6440AF (TV2) for most installations. Without TV2 it is possible that when a small zone is the only zone calling, a master bathroom zone for instance, all of the heat the boiler is producing is drawn to the small zone.
  • Page 35 The back up boiler will be energized through the BLTCONTROL to meet the heat demand. Tarm Biomass recommends the use of an additional Termovar valve model 6440AF (TV2) for most installations. Without TV2 it is possible that when a small zone is the only zone calling, a master bathroom zone for instance, all of the heat the boiler is producing is drawn to the small zone.
  • Page 36: Electrical Connection

    The white wire connects to (L), the red wire connects to (N), and the ground wire connects to the fan’s Fig. 3.8 grounding screw (Fig. 3.9). Circulator Connections *Please refer to Section 6.4.5 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 37: Descriptions Of Functions

    # 1040705), must be installed as shown in Fig. 3.10. A ¾: nipple, ¾” Tee, and ¾”X ¼” reducer is provided to ease installation. Fig. 3.10 Installed Relief Valve Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 38: Filling And Venting

    Remove the hose after filling up. High quality air elimination equipment is recommended in the heating system installation. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 39: Final Installation Checklist

    (fan blades) are not hitting mounting bolts located on the inside of fan housing. Re-adjust the squirrel cage if needed. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 40: Boiler Operation, Maintenance, And Service

    The Fuse is located on circuit board behind control panel. (D) Fuse max. 6.3A (5X20 mm). (E) Switch for Circulator Pump This switch is not used in the North American Market. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 41 The Lo-Limit Thermostat switches off the fan and the pump when the wood has burned out. It is set to 90 °C (195 ºF). Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 42: Items To Check Before Using

    6. Add wood. Try to stack the wood as evenly as possible. 7. Close the door. 8. Switch on the fan switch (F). 9. Press the reset switch (N). Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 43: Daily Firing

    4.7 Operation with Thermal Storage System Tarm Biomass requires that the Solo Innova be permanently connected to a Thermal Storage System. The boiler will always be able to discharge its heat resulting in better combustion, less depositing of soot and tar, and longer boiler life.
  • Page 44: Adjusting Combustion

    Flame too long and reddish yellow The flame is yellow and Flame too short and bluish Increase Secondary air. pale bluish. Reduce Secondary air. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 45: Firing Tips

    Other waste should not be placed in this container. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 46 Be aware that the hotter the fire, the less creosote is deposited, and that weekly cleanings may be necessary in mild weather, even though monthly cleanings may be enough in the coldest months. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 47: Cleaning Firebox Aprons

    Lugs “L” Bolts Fig. 4.7 Smoke Box and Heat Exchangers Smoke Box Fig. 4.8 Cover Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 48: Cleaning The Induced Draft Fan

    Please inspect the draft fan carefully – even a thin coating of ash significantly reduces the air flow and must be removed. NOTE If the fan motor is blocked because of lack of cleaning, the motor can be ruined. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 49: Maintaining Door Seals

    4. If necessary, clean the openings and air channels. Ventilation Holes Apron Fig. 4.11 Primary Air Ventilation Holes Fig. 4.10 Firebox with Aprons Removed Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 50: Cleaning The Smoke Duct

    Chimney inspection and maintenance is a critical part of any wood-burning maintenance sched- ule. Make sure that the chimney connection is secure and airtight. Inspect chimney regularly and clean as needed. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 51: Checking The Barometric Damper

    The pressure relief valve should be seated properly and not drip system water. The pressure relief valve should be inspected and maintained according to the manufactures recommendations. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 52: Power Outages

    90 °C (194 ºF). Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 53: Data And Drawings

    B4 Measurement inches 54.13 54.13 B5 Measurement inches 56.10 56.10 B6 Measurement inches 56.69 56.69 B7 Measurement inches 46.77 46.77 B8 Measurement inches 45.28 45.28 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 54: Positioning Data

    D-Front of Appliance 36” Required Distance for Cleaning the Boiler. E-Ceiling to Appliance 24” Required Distance for Cleaning the Boiler. F-Combustibles to Pipe 18” Minimum Distance Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 55: Specification Data

    1¼” 1¼” Minimum Boiler Loop size inch 1¼” 1¼” Fill/ drain valve size inch Mixing Valve Opening Setting Fº Internal Overheat Aquastat Setting Fº Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 56: Electrical Diagrams

    Switch for Door Interlock Cable for door Interlock-Not Used Circulator Pump-Not Used Terminal Strip Solenoid Coil Circulator Pump-C3 6.4.2 Wiring Diagram A (Boiler Circuit Ladder Diagram) Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 57: Wiring Diagram B (Boiler Circuit Diagram)

    Page 53 Data and Drawings > Electrical Diagrams 6.4.3 Wiring Diagram B (Boiler Circuit Diagram) Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 58: Control Panel

    S8-Fan Switch S10-Door Open Switch X1-Terminal Block-Used for misc. Connections X2-Door Safety Terminal Block-Not used in North America X3-Supply Terminal X10-Fan and Circulator Terminal Block Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 59: Wiring Connection

    Page 55 Data and Drawings > Electrical Diagrams 6.4.5 Wiring Connections External connections to the boiler. Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 60: Parts Lists

    Page 56 Data and Drawings > Parts List 6.5 Parts List 6.5.1 Solo Innova 30 Parts List Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 61: Solo Innova 50 Parts List

    Page 57 Data and Drawings > Parts List 6.5 Parts List 6.5.2 Solo Innova 50 Parts List Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 62: Warranty Information

    During the first five years of the warranty period Tarm Biomass will pay for all required labor at the usual and customary rate paid by Tarm Biomass for similar labor performed in Lyme, NH, and provide or pay the cost of all materials for the re- pair of the warranted unit.
  • Page 63 ABILITY, OR ANY OTHER THEORY OF LAW, ALL SUCH DAMAGES AND CLAIMS BEING SPECIFICALLY DIS- CLAIMED. Tarm Biomass’ limited warranty is void if a Tarm Biomass product is installed by someone other than a quali- fied contractor whose principal occupation is the sale or installation of plumbing and heating equipment, or if the original purchaser fails to have the boiler serviced or inspected at least once every two years by an experienced and qualified service person.
  • Page 64: Installation Report For Boiler System

    Date Date Date Date Fuel Type Fuel Moisture Content Secondary Air Setting Primary Air Setting Pump Speed (C-3) Other Data/Adjustments Setting Done By: Signature Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 65: Appendix A-Temperature Conversion

    °C °F °C °F 179.6 183.2 125.6 186.8 129.2 190.4 132.8 136.4 197.6 201.2 143.6 204.8 147.2 208.4 150.8 154.4 161.6 165.2 168.8 172.4 Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...
  • Page 66: Notes

    Page 62 Notes > Notes Notes: Solo Innova Instructions 1-800-782-9927 Version 01-18 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768...