Operation & Service Manual
Installation Box preparation
Carrier Transicold Europe
Drilling
Roof top and cut mounting
31/03/07
5. Install the 4 silent blocks:
put silicone to waterproof on the bottom.
put silicone to waterproof on the 4 screws before to install
the host unit.
Viento - Installation/Rev- #9/54