15. Commissioning Cont.
• Turn the boiler OFF.
• Open the gas valve outlet
pressure
test
point
(figure 15.5) and connect
the gauge.
• Turn
the
boiler
positioning
the
selector B in the position
shown in figure 15.7 and
ensure
that
the
thermostat is set to "heat
demand".
Figure 15.7
• Loosen
screws
remove the service panel
(figure 15.8).
D
D
D
Figure 15.8
• Turn the boiler OFF.
• Open the gas valve outlet
pressure
test
point
(figure 15.5) and connect
the gauge.
• Turn
the
boiler
positioning
the
selector B in the position
shown in figure 15.7 and
ensure
that
the
thermostat is set to "heat
demand".
40
Riva Plus Manual

15.6 Checking the burner ignition:

• Watch
check to see if the ignition
pressure
15
corresponds to the values
given
Data. Turn off the boiler
ON
and reignite it by turning
function
the function selector B to
the 0 position and then
back to that indicated in
room
figure 15.7.
• Repeat this process two to
three times leaving
B
second intervals between
each ignition. Check the
ignition
visually check
burner lights uniformly and
D
and
in a controlled manner.
• To
carry
adjustment
function selector 3 to the
OFF position (Fig. 15.9)
and use the device (ACC).

15.7 Adjustment of the useful c.h. output:

• Loosen
remove the service panel
(figure 15.8).
15
• To
carry
adjustment
adjustment device (RISC)
ON
with
the
function
screwdriver.
• By
rotating
room
clockwise
increases.
• Adjust the gas pressure at
the burner to the value
according to the useful c.h.
output wanted (Tab. 15.1).
the
gauge
and
registerd
in
the
Technical
30
pressures
and
that the
out
the
move
the
screws
D
and
out
the
use
the
help
of
a
the
device
the
pressure
1
Figure 15.9
• Adjust the gas pressure at
the injectors to the value
indicated in the tables of
section 2. By rotating the
device
clockwise
pressure increases.
• After
the
adjustment
operations
bring
selector 3 of figure 15.9
back to the normal position
(ON).
• Reassemble the service
panel.
• Close the gas valve outlet
pressure
test
point
(figure 15.5).
• Reassemble
the
pannel of the case.
Important:
after
checks all of the test
points must be sealed.
• Reassemble the service
panel.
• Close the gas valve outlet
pressure
test
point
(figure 15.5).
• Reassemble
the
pannel of the case.
+
RISC
+
ACC
ON
2
3
4
OFF
the
the
15
front
the
15
front

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents