Fire Place Opening / Catchment Space - Kohlangaz Gosford Installation And Maintenance Instructions Manual

Inset live fuel-effect gas fires
Table of Contents

Advertisement

Check the chimney pot / terminal and general condition of the
brickwork or masonry. If the chimney or flue is in poor condition or if
there is no up-draught do not proceed with the installation. If there is a
history of down-draught conditions with the chimney / flue, a tested and
certificated flue terminal or cowl suitable for the relevant flue type should
be considered.
6.
A spillage test must always be carried out during commissioning of
the appliance.
1.6
FIRE PLACE OPENING AND CHIMNEY CATCHMENT SPACE
The front opening of the fire place must be between 400 and 450 mm wide, and
between 550 and 570mm high. If the opening exceeds these dimensions then a
surround must be constructed from suitable non-combustible material to produce a
correct size opening. Any surround must be suitably sealed to the fire place to
prevent leakage. See below in figure 1.
Fig. 1
550mm Minimum
570mm Maximum
When installing into a brick built chimney, you must ensure that there is sufficient
depth to accomodate any debris which may fall from the chimney. This depth
must be sufficient to accomodate 12 litres of volumetric space.
470mm Minimum
Fire Opening
400mm Minimum
450mm Maximum
7
Minimum Flat
Sealing Area
580mm
Minimum

Advertisement

Table of Contents
loading

Table of Contents