Battery Installation; Battery Storage - Bush Hog TH420 Operator's Manual

Trail series off road utility vehicle assembly, operation, maintenance
Hide thumbs Also See for TH420:
Table of Contents

Advertisement

Battery Installation

1. Set the battery in its holder.
2. Install the battery tie-down bracket and tighten the nuts.
3. First connect the positive (red) cable.
4. Second connect the negative (black) cable.
5. Verify that cables are properly routed.
NOTE: When installing a new battery, make sure it is fully charged
prior to its use. Using a new battery that has not been fully charged
can damage the battery and result in a shorter life. It can also hinder
vehicle performance.

Battery Storage

When the vehicle is placed in storage for three months or more, the
battery should be removed, stored out of the sun in a cool, dry place
and tested monthly. Before reusing, take the battery to your dealer for
testing and recharging.
Tie-Down Bracket
Negative (Black) Cable
Positive (Red) Cable
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Th440Th4200Th4400

Table of Contents