IEC Vertical F*C Series Installation, Operation & Maintenance Manual page 9

Fan coils vertical f*c series
Table of Contents

Advertisement

Schneider Erie
Manual Operating
Lever
Release Button
Mating
Hole
Stem
General Close-O (G)
Taco Line Voltage
Step 1: Rotate
actuator counter
clockwise
approximately
30 degrees.
Locking Post
A
Taco Zone Sentry
Step 1: Push in and hold
release clip at the front
of the actuator.
Figure 3: Valve and Lever–Pop-Top Installation
If the valve package connection at the coil is a union, the coil
side of the union must be prevented from twisting ("backed
up") during tightening to prevent damage to the coil tubing.
Do not over tighten the union preventing distorting ("egg
shaping") of the union seal surface and destroying the
union.
International Environmental Corporation • Vertical F*C Series Fan Coil Installation, Operation, & Maintenance Manual
IEC Vertical F*C Series Fan Coils
Release
Button
Manual
Operating Lever
Mating
Hole
High Close-O (H)
Step 2: Move actuator
upward 3/4" to disengage.
B
Step 2: Move actuator
away from the valve body
approximately 3/4" to
disengage locking posts
and stem.
Locking Post
www.iec-okc.com
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
The supply and return connections are marked on the coil
stub outs and the valve package, with an "S" meaning supply
or inlet and "R" meaning return or outlet indicating fluid flow
direction to and into the coil. Blue letters mark the chilled
water connections and Red letters mark the hot water or
steam connections.
In the case of field-installed valves and piping, install the
chilled water valve cluster (or expansion valve on DX units)
in such a way that any dripping or sweating caused from
condensation is contained in the drain pan or other device
such as an optional extended drain pan or factory drip lip.
Factory drip lips are field installed and may be packaged
separately from the unit. Factory supplied cooling coil valve
packages will be arranged to locate as much of the package
as possible over a standard drip lip. Some field configurations
may require additional insulation be applied to the exposed
water piping to prevent condensation from dripping into
areas not directly above the auxiliary drain pans.
If none of the above factory accessories are provided with
the units, simple flashing may be used to carry moisture into
the unit drain pan.
Field Piping Connections
To chilled water coil: IEC's innovative design incorporates
3/8" copper tubing inside and stubbing out of the coil. To
facilitate ease of connecting to field supplied ½" hydronic
tubing, there is a 3/8" to 1/2" swedge adaptor installed on
both the supply and return water tube connections to the
coil. Care must be taken when soldering the field supplied
tubing to this connection.
The use of solder with a flow or initial melting point below
500°F is recommended to make these connections. Local
codes and/or building specifications should always be
consulted to ensure solder being used is compliant with
current building standards. When making soldering
connections, use a wet rag as a heat sink around the factory
adaptor to prevent overheating of this joint. See Figure 4.
After soldering, use the wet rag to quench the field and
factory connections at this fitting.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

FhcFxcFvc

Table of Contents