Buderus Logamax plus GB142-24 Installation And Servicing Instructions page 42

Condensing gas heater
Hide thumbs Also See for Logamax plus GB142-24:
Table of Contents

Advertisement

10
BC10 basic controller
Press the "Chimney Sweep"
to set the pump post-purge period. The pump post-
purge period can be set from 5 – 60 minutes (
) or to 24 hours (
Press the "Service"
NOTICE
On thermostat only systems a 5 to 10 minute
post-purge setting is recommended to purge
heat from the appliance.
We reserve the right to make any changes due to technical modifications!
42
or "Reset"
buttons
).
button to confirm the setting.
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
/
-
Buderus Hydronic Systems • http://www.buderus.net

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents