Download Print this page

Minimum Clearances; Electricity Supply; Important Notes - IDEAL Mexico HE15 User Manual

Hide thumbs Also See for Mexico HE15:

Advertisement

mexico HE15, HE18, HE24, HE30, HE36
(Natural Gas Only)
Destination Countries: GB, IE
I n t r o d u c t i o n
The mexico HE is a floor standing, room sealed,
condensing boiler featuring full sequence automatic spark
ignition and fan assisted combustion.
Due to the very high efficiency of the boiler condensate is
produced from the flue gases and this is drained to a
suitable disposal point through the plastic waste pipe at the
right lower rear of the boiler. A condensate 'plume' will also
often be visible at the flue terminal.
S a f e t y
Current Gas Safety (Installation & Use)
Regulations or rules in force.
In your own interest, and that of safety, it is the law
that this boiler must be installed by a CORGI
registered installer.
In IE the installation must be carried out by a
competent person and installed in accordance with
the current edition of I.S. 813 "domestic Gas
Installations", the current Building Regulations and
reference should be made to the current ETCI rules
for electrical installation.
It is essential that the instructions in this booklet are
strictly followed, for safe and economical operation of
the boiler.

Electricity Supply

The appliance must be earthed.
Supply 230 V - 50 Hz.
The fusing should be 3A.
This appliance is intended to be connected to the supply via a
double-pole switch, having a 3mm contact separation in both
poles, serving only the boiler and system controls. Alternatively, a
3-pin UNSWITCHED socket may be used.

Important Notes

This appliance must not be operated without
the casing correctly fitted and forming an adequate seal.
If the boiler is installed in a compartment then the compartment
MUST NOT be used for storage purposes.
Under NO circumstances should any of the sealed components
on this appliance be used incorrectly or tampered with.
If it is known or suspected that a fault exists on the boiler
then it MUST NOT BE USED until the fault has been
corrected by a CORGI registered installer or in IE a
competent person.
All CORGI registered installers carry a CORGI ID card, and have a registration number. Both should be recorded
in the Benchmark Commissioning Checklist. You can check your installer by calling CORGI direct on 01256 372300.
Ideal Stelrad Group is a member of the Benchmark initiative and fully supports the aims of
the programme. Benchmark has been introduced to improve the standards of installation and
commissioning of central heating systems in the UK and to encourage the regular servicing of
all central heating systems to ensure safety and efficiency.
THE BENCHMARK SERVICE INTERVAL RECORD MUST BE COMPLETED AFTER EACH SERVICE
2
Supplied By www.heating spares.co Tel. 0161 620 6677
HE15
G.C. Appliance No. 41-429-39
HE18
G.C. Appliance No. 41-429-65
HE24
G.C. Appliance No. 41-429-98
HE30
G.C. Appliance No. 41-429-99
HE36
G.C. Appliance No. 41-415-20
This appliance is not intended for use by persons
(including children) with reduced physical, sensory or
mental capabilities, or lack of experience and knowledge,
unless they have been given supervision or instruction
concerning use of the appliance by a person responsible
for their safety.
Children should be supervised to ensure that they do not
play with the appliance.
In cases of repeated or continuous shutdown a CORGI
registered installer or in IE a competent person should be called
to investigate and rectify the condition causing this and carry out
an operational test after each intervention on the device. Only the
manufacturers original parts should be used for replacement.

Minimum Clearances

Clearances of 20mm (3/4") above, 5mm (1/4") at the sides and
450mm (17 3/4") at the front of the boiler casing must be
allowed for servicing.
The minimum front clearance allowed when built into a
cupboard is 5mm.
To light the boiler
(Refer to Frame 1)
1. CHECK THAT THE ELECTRICITY SUPPLY TO THE BOILER
IS OFF.
2. Set the mains on/off switch (A) to off and the CH thermostat
knob (B) to maximum.
3. Switch on the electricity supply to the boiler and check that all
external controls, e.g. programmer, room stat, etc. are on.
4. Set the mains on/off switch to ON.
The boiler will commence the ignition sequence, supplying heat
to the system when required.
Operation
In normal operation the control unit display (E) will show the codes:
O - Standby (no demand for heat)
C - CH or DHW being supplied
P - Boiler frost protection (boiler will fire when temperature is
less than 3
o
C)
During ignition the LED (D) will flash.
During normal running the LED will remain illuminated.
Note. If the boiler fails to light after 3 attempts the fault code 'L' 'F'
will be displayed.
Press and hold the reset button (C) for 2 seconds then release.
The boiler will repeat the ignition sequence. If the boiler fails to
light consult a CORGI registered installer or in IE a competent
person.
mexico HE -
Users

Advertisement

loading

This manual is also suitable for:

Mexico he18Mexico he24Mexico he30He36Mexico he36