Test Operation - Midea MFJ-24ARN1-QB8 Technical & Service Manual

Floor standing type air conditioner
Table of Contents

Advertisement

(Wiring size: 2.5mm )
(Wiring size: 2.5mm )
Note: Some models is equipped with a cord having a plug, So a wall outlet shall be properly
installed.

6.6 Test operation

Perform test operation after completing gas leak and electrical safety check. The test operation
time should last more than 30 minutes.
1). Open the panel and lift the panel up to angle which remains fixed. Do not lift the panel any
further when it stops with a "click"sound.
2). Press the manual switch button twice until the operation indicator lights, the unit will operate on
Manual Cool mode.
3). Check if all the functions work well while testing the air conditioner. Especially check whether
the drainage of indoor unit is smooth or not.
4). Press the manual switch button again till the operation indicator turns dark after finishing the
test operation and the unit stops operation.
2
2
16
Installation detail

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfj-48arn1-rb6

Table of Contents