Page 2
CONTENTS
General ....................................................................... 2
Boiler Location ............................................................ 2
Inspection ................................................................... 4
Boiler Blocks ............................................................... 4
Jacket Assembly ......................................................... 4
Boiler Trim .........................................
Piping Connections ............................
Circulators .................................................................. 8
Warranty ................................................................... 25
GENERAL
The 8 Series boiler-burner unit is a wet-base, vertical fl ue,
low pressure, sectional, cast iron steam or hot water
heating boiler. It is rated for natural draft firing with
-0.02" W.C. over the fi re draft. Boilers are available as
either factory assembled in blocks from three to six
sections in length with burner and controls supplied for
fi eld assembly or as a completely packaged boiler.
The ports between sections are provided with a special
hydronic seal which is resistant to petroleum products.
The fl ue gas seal between sections is accomplished by
the use of fi berglass rope rated at 1000°F.
Both packaged units and assembled blocks of sections
are hydrostatically tested for the maximum working
pressures. The assembled blocks also include the
special hydronic seals, the glass fi ber rope joint seal, a
precast fi ber target wall, the insulated burner mounting
plate and cleanout covers.
An insulated metal jacket is furnished to both enhance
the units looks and to minimize any heat loss. A
full access cleanout cover for cleaning vertical fl ue
passages is on the left hand side of the boiler and is
accessible by removing the left hand cleanout access
jacket panel.
8 SERIES BOILER INSTALLATION AND OPERATING INSTRUCTIONS
5,
5,
(Water)
6,
(Water)
8,
9-10,
The Series 8 boiler is offered in 3 different confi gurations:
1 - Packaged boiler with "burner in the box" shipped
separately.
2 - Packaged boiler with burner mounted and wired.
3 - Assembled cast iron block with accessories loose.
IMPORTANT - Suffi cient clearance between the
left side of the boiler and adjacent construction
must be provided to ensure proper access when
cleaning is required!
11
12
(Steam)
CODES, RULES AND REGULATIONS
11
(Steam)
The installation of the boiler, the burner, wiring, controls
and fuel piping must be done in accordance with the
requirements of the local authorities having jurisdiction.
14
In the absence of local requirements, the following
15
codes apply:
ANSI/NFPA31 - "Installation of Oil Burning Equipment"
ANSI/NFPA70 - "National Electrical Code"
In Canada the following codes apply:
CSA STD. B149 - Latest Edition.
"Installation Code For Oil Burning Equipment."
CSA STD. C22.2 No. 0 - Latest Edition.
"General Requirements - Canadian Electrical Code
Part II."
All completed boilers shall satisfactorily pass the
hydrostatic tests as prescribed by A.S.M.E., Code
Section IV.
1. Steam Boilers - The assembled boiler shall be
subjected to a hydrostatic test of not less than 45
psig.
2. Water Boilers - The assembled boiler shall be
subjected to a hydrostatic test pressure of 60 psig.
3. The required test shall not exceed the test pressure
by more than 10 psig.