Smith SERIES 28RTS/HE Installation & Operating Instructions Manual

Gas or oil water boiler

Advertisement

GAS OR OIL WATER BOILER
INSTALLATION & OPERATING
DESIGNED AND TESTED ACCORDING TO A.S.M.E. BOILER AND PRESSURE
VESSEL CODE, SECTION IV FOR A MAXIMUM ALLOWABLE WORKING PRESSURE
OF: 80 PSI, 552 kPa.
WARNING: If the information in this manual is not followed exactly, a fi re or explosion
may result causing property damage, personal injury or loss of life.
Do not store or use gasoline or other fl ammable vapors and liquids in the vicinity of
this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
• Do not touch any electrical switch. Do not use any phone in your building.
• Immediately call your gas supplier from a neighbor's phone. Follow the gas
supplier's instructions.
• If you cannot reach your gas supplier, call the fi re department.
Installation and service must be performed by a qualifi ed installer, service agency or
the gas supplier.
WARNING: The only liquid fuel to be used in this boiler is #2 fuel oil. Never use gasoline,
crankcase drainings, oil containing gasoline or any other liquid fuels in the boiler!
Never burn garbage or paper in the boiler! Failure to comply with this warning can
result in an explosion or fi re causing extensive property damage, severe personal
injury or death!
INSTALLER, READ THESE INSTRUCTIONS CAREFULLY. THEY WILL SAVE YOU VALUABLE TIME WHEN
ASSEMBLING THE BOILER. THESE INSTRUCTIONS TO BE AFFIXED ADJACENT TO THE BOILER.
CONSUMER, RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE PURPOSES.
FOR JACKET ASSEMBLY AND BURNER SET UP SEE SEPARATE INSTRUCTIONS.
In Canada: 7555 Tranmere Drive, Mississauga, Ont. L5S 1L4 (905) 670-5888 Fax (905) 670-5782
SERIES 28RTS/HE
INSTRUCTIONS
WESTCAST, INC.
260 NORTH ELM STREET WESTFIELD, MA 01085
TEL. (413) 562-9631 FAX (413) 562-3799
RTS-IOM-3

Advertisement

Table of Contents
loading

Summary of Contents for Smith SERIES 28RTS/HE

  • Page 1 RTS-IOM-3 SERIES 28RTS/HE GAS OR OIL WATER BOILER INSTALLATION & OPERATING INSTRUCTIONS DESIGNED AND TESTED ACCORDING TO A.S.M.E. BOILER AND PRESSURE VESSEL CODE, SECTION IV FOR A MAXIMUM ALLOWABLE WORKING PRESSURE OF: 80 PSI, 552 kPa. WARNING: If the information in this manual is not followed exactly, a fi re or explosion may result causing property damage, personal injury or loss of life.
  • Page 2: Table Of Contents

    Direct all questions to your Smith Cast Iron Boiler distributor or contact the Smith Customer Service Department. Always include the model and serial...
  • Page 3: Boiler Ratings & Capacities

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 3 BOILER RATINGS & CAPACITIES 4. The boiler should be installed on a level, flat, concrete fl oor or pad that is structurally sound and Before undertaking the installation of the RTS Series will support the weight of the boiler.
  • Page 4: Combustion Air & Ventilation

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 4 COMBUSTION AIR & VENTILATION The bottom opening must be within 12 in., 305 mm of, but not less than 3 in., 76 mm from, the bottom of the enclosure. WARNING: This boiler must be supplied with...
  • Page 5: Chimney & Vent Pipe Connections

    fl ue gas temperatures. An oversized or uninsulated have to be reduced. Contact the Smith Technical Service chimney will cause the moisture in the fl ue gases Department to verify the burner capacity.
  • Page 6 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 6 Figure 2- Vertical Venting VENT CONNECTIONS The vent materials used in positive pressure vent systems must be certified to UL 1738 for installations in the United States, ULS636 for WARNING: Never modify or alter any part of the installations in Canada.
  • Page 7: Common Vent Systems

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 7 Always provide a minimum clearance of 6 in., 152 mm c) Insofar as is practical, close all building doors and between single wall metal vent pipe and all combustible windows and all doors between the space in which materials.
  • Page 8: Boiler Assembly

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 8 After it has been determined that each appliance BOILER ASSEMBLY remaining connected to the common venting Locate the boiler installation site based on the guide- system properly vents when tested as outlined lines set forth in the BOILER LOCATION section.
  • Page 9 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 9 Completed boilers must be tested as follows: 2. Carefully place the back section in position on the angles as shown in Figure 4. Water Boilers – the assembled boiler sections shall be...
  • Page 10 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 10 5. Insert the large port connector with its steel inner Table 4 - Section Torque Sequence ring into the upper port. Step Rod Position Torque ft lbs 6. Insert the two round port connectors into the lower Upper Right ports with steel inner ring.
  • Page 11 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 11 Table 3 - RTS Support Bracket Locations Boiler Section Location Numbered From Front To Back Model Front Section Intermediate Section w/ Support Bracket Intermediate Section w/ Heater Opening Intermediate Section, Plain...
  • Page 12 Inspect the covers to ensure that the insulation the boiler to the rope groove on the plate. Allow time is not damaged or missing. If it is call the Smith for the fi rst coat to dry then apply the second coat.
  • Page 13 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 13 Figure 11 - Burner Mounting Plate Details Observation Port Assembly, Figure 12 Figure 12 - Observation Port Assembly 1. Position the hinged end of the steel flapper door, item 5, over the boss on the observation port cover, item 4.
  • Page 14 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 14 Observation Port Installation Smokehood Installation, Figure 13 1. Screw the four 5/16-18 x 1-1/2 in. studs into the 1. Screw the four 5/16-18 x 1-1/2 in. studs into the tapped holes around the observation cover opening tapped holes around the smokehood opening in the in the back section.
  • Page 15 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 15 Tankless Heater Installation - Optional 5. Install the operating control in one of the heater 1. Clean the heater flange to remove any rust or mounting plates to ensure quick burner response debris.
  • Page 16: General Piping Requirements

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 16 GENERAL PIPING REQUIREMENTS If a boiler is installed above any radiation elements it must be fi tted with a low water cutoff device. CAUTION: Never use automotive antifreeze in the boiler or heating system. If antifreeze is necessary Relief &...
  • Page 17: Water Boiler Piping

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 17 Table 5 - Water Tappings 2. Once the cast iron sections have been assembled install the eight 3/4 in. x 3 in. studs in the upper rear Tapping Size Water casting. Apply a thread sealant to the studs before 1/8"...
  • Page 18 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 18 Table 7- RTS Component Table Figure 23 - RTS Installed Flanged 3 Hole 2 Hole 3 Hole 4 Hole Support Model Int. Bracket 70-1201 70-1202 70-1203 70-1204 70-1205 03-1059 Figure 21 - RTS Installation...
  • Page 19 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 19 Control Installation Cleaning Of Water Boilers Locate the temperature & pressure gage, low water cutoff, Normally the cleaning of water boilers is unnecessary high limit and operating controls per Figures 17 & 24 and unless there is unusually heavy contamination of the Table 5.
  • Page 20 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 20 1. Install ball valves on the two 3 in. NPT nipples in the 4. Mix the cleaning chemicals with water to create a bottom of the front section and pipe to a suitable concentrated solution.
  • Page 21: Burner Installation

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 21 BURNER INSTALLATION Line voltage fi eld wiring of any controls or other devices must conform to the temperature limitation of type TEW wire at 95°F, 35°C above room temperature. Use copper WARNING: The burner must be installed in conductors with a minimum size of #14 awg.
  • Page 22: Boiler Checking & Adjustment

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 22 CAUTION: If the fl ue gas temperature exiting the BOILER CHECKING & ADJUSTMENT smoke hood is less than 320°F, 160°C at full rated CAUTION: Never increase the input to the boiler input, the number of heat transfer rods in the boiler above that for which it is rated.
  • Page 23: Boiler Maintenance

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 23 BOILER MAINTENANCE 11. Install the left jacket panels and remount the burner. 12. Restore electrical power and fuel to the boiler. WARNING: Servicing, inspection and adjustment of the boiler must be done by a trained Oil Filters &...
  • Page 24 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 24 Figure 25 - Boiler Assembly...
  • Page 25: Repair Parts

    SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 25 Number of Sections with Item Quantities Below Ref # Name of Part Part # Front Section with Flange Connection 01-3702 Graphite Port Connector Set 60375 Draw Rod Washers 62099 5/8" x 11" Draw Rods...
  • Page 26 SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Page 26 Number of Sections with Item Quantities Below Ref # Name of Part Part # Rear Observation Port Hardware 71301 Burner Mounting Plate Assembly, 9" 70641 Burner Mounting Plate Assembly, 10 1/4"...
  • Page 27: Health Warnings

    Carbon Monoxide (CO) is a gas which is odorless, colorless and tasteless but is very toxic. If your Smith boiler is not working properly, or is not vented properly, dangerous levels of CO may accumulate. CO is lighter than air and thus may travel throughout the building. BRIEF EXPOSURE TO HIGH CONCENTRATIONS OF CO, OR PROLONGED EXPOSURE TO LESSER AMOUNTS OF CO MAY RESULT IN CARBON MONOXIDE POISONING.
  • Page 28 WESTCAST, INC. 260 NORTH ELM STREET WESTFIELD, MA 01085 TEL. (413) 562-9631 FAX (413) 562-3799 In Canada: 7555 Tranmere Drive, Mississauga, Ont. L5S 1L4 (905) 670-5888 Fax (905) 670-5782...

Table of Contents