Prepare boiler location
Place the boiler:
Remove outer crate
1. Remove outer crate, leaving boiler on the crate base.
. Remove the circulator and barometric damper cartons from the crate
base.
. UO- boilers only — Remove the two flue baffles fastened to the crate
base behind the boiler.
4. Remove the two shipping channels by loosening and removing the four
nuts. Save the shipping channels for leveling leg installation.
. Remove the jacket crosstie fastened to the crate base.
Install the leveling legs if used (required if boiler is placed on
combustible flooring)
The leveling legs must be installed if the boiler is placed on
combustible flooring.
A second person, or other means, is required to stabilize the
boiler during leveling leg installation. Failure to do so could
result in severe personal injury or property damage.
Wear heavy leather work gloves when handling the shipping
channels in the following steps to avoid potential severe per-
sonal injury.
1. (Figure a) Use one channel as a lever to raise the front of the boiler.
. (Figure a) Insert the other channel between the boiler leg and crate
base. Place the channel directly over the crate base runner, as shown.
. (Figure b) Lift the channel under the boiler leg slightly.
4. (Figure b) Slide the other channel under the other boiler leg. Place the
channel directly over the crate base runner, as shown.
. (Figure ) With the boiler resting securely on the two shipping chan-
nels, screw a leveling leg in each boiler leg hole. Screw leveling legs in
completely.
To avoid potential personal injury or property damage, DO
NOT attempt to insert leveling legs unless the boiler is securely
seated on both shipping channels.
6. Reverse steps 1 through 4 above to remove the shipping channels. Leave
the boiler on the crate base.
7. Follow steps 1 through 6 on the back side of the boiler to install leveling
legs in the rear section legs.
8. Leave the boiler on the crate base.
Remove boiler from crate base
Boilers may be top heavy. Use caution when handling to avoid
personal injury or property damage.
1. Attach the crosstie to the jacket side panels using the two screws located
in the barometric damper carton. Then remove the boiler from the crate
base.
Do not remove the boiler from the crate base without first
installing the jacket crosstie. The boiler wiring harnesses or
connectors could be damaged.
. If necessary, the boiler jacket can be removed for handling. See pages 0
and 1 in this manual for the jacket removal/replacement procedure.
Part number 550-141-986/1005
— Boiler Manual
(continued)
Figure 2a To install leveling legs: Insert first
shipping channel under boiler leg.
Figure 2b To install leveling legs: Insert
second shipping channel under
Figure 3
Inserting levelling legs