COMMISSIONING INSTRUCTIONS

1. Install appliance as per installation instructions on previous page.
2. Open gas valves to appliance.
3. Check for gas leaks.
4. Proceed to light as per lighting instructions on page 3.
5. Set ATPP as per settings listed on "SPECIFICATIONS" on page 7.
6. Explain the operation of the appliance to the end user.
7. Explain the content of this manual to the end user ensuring the 'WARNINGS', 'OPERATION' and
'TROUBLE SHOOTING' sections are understood.
8. If the gas supply to this appliance is from a gas cylinder, explain to the end user the installation
and positioning requirements of AS 5601 Appendix J - "LP Gas Cylinders".
9. Hand this manual to the end user and remind the end user to complete the details on page 14 of
this manual and to keep this manual in a safe place for future reference.
• Installer to explain operation to the customer remind them to operate Rice Cooker in
accordance with these instructions and that these instructions be kept in a secure place for
future reference.
ATPP (Appliance Test Point Pressure)
Remove spill tray to access from top of unit
Rinnai Australia
Main Burner Pressure Adjustment
To access remove cover on base of unit