Installers Instructions; Clearances - Rinnai RER-55AS Operation & Installation Manual

Natural gas & ulpg gas rice cooker
Table of Contents

Advertisement

INSTALLERS INSTRUCTIONS

• This appliance must be installed and commissioned by an authorised person only.
WARNING
1. Carefully unpack unit and confirm that you have the carton contents as listed on See "CARTON
CONTENTS" on page 2.
2. Remove all packing material. Check for damage if any components appear damage do not install
and contact supplier.
3. Choose a well ventilated area.
4. Locate the unit on a bench top that is free and clear of combustible materials and other
flammable vapours and liquids.
5. Observe clearances as shown in clearances diagram below.
DO NOT obstruct flow of combustion and ventilation air.
6. Connect the gas regulator and isolation valve. Note: Gas supply to be correctly sized. Refer to
commissioning chapter follow requirements of AS 5601.
7. Check for gas leaks.
• To test unit operation of safety FFD, (Flame Failure safety Device).
CAUTION
8.
Remove Pot, Heat shroud and Drip tray.
• Open gas supply valve isolator valve.
• Push ignition knob down until it clicks and push down for approximately 3-4 seconds.
• Release Ignition - pilot should remain lit. If it does not remain alight repeat the step above.
• The
KEEP WARM
• Pull the
KEEP WARM
• This Click sound is the FFD safety valve dropping out and signifies proper operation of the
safety valve.

CLEARANCES

• Sides and rear from combustible materials - minimum15 cm
• To overhead
• cupboard or extraction fan - minimum 60 cm
Rinnai Australia
knob will remain down.
knob up and listen for a faint metallic click sound.
60 cm
8
Rice Cooker Operation & Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents