Installing the boiler and making all connections
Balanced flue connection
Opening the control unit
2.
3.
4x
Installation sequence
(cont.)
Connect the balanced flue.
During installation and positioning of the
flue gas system, observe building regu-
lations part L and BS 5440.
Flue gas system installation
instructions.
2x
1.
13