Table Of Contents - UTICA BOILERS PEG075EID Installation, Operation & Maintenance Manual

Peg-e series gas-fired steam boilers
Table of Contents

Advertisement

Important Safety Information ....................... 5
Locating the Boiler ...................................... 6
Hydronic Piping .......................................... 8
Fresh Air for Combustion ............................12
Vent Damper Operation ..............................15
Gas Supply Piping ......................................16
Electrical Wiring ........................................17
Operating Instructions ................................18
Operating Your Boiler .................................19
Checking and Adjusting ..............................20
Start-up Cleaning ......................................22
General Maintenance .................................23
Troubleshooting .........................................24
Wire Diagrams ..........................................25
Optional Hydronic Piping .............................28

TABLE OF CONTENTS

KEEP THIS MANUAL NEAR BOILER
RETAIN FOR FUTURE REFERENCE
GAS FIRED STEAM BOILERS
Check our website frequently for updates: www.ecrinternational.com
Information and specifi cations outlined in this manual in effect at the
time of printing of this manual. ECR International reserves the right to
discontinue, change specifi cations or system design at any time without
notice and without incurring any obligation, whatsoever.
Introduction
Boiler is designed for use in closed heating systems where
all steam is returned as condensate and make-up water is
minimal. Boiler is not designed for or intended for use in
open systems using 100% make-up water.
Prior to Installation
• Verify correct boiler for type of gas being used
natural or propane. See Rating Plate.
• Verify boiler size and dimensions. See Figure 1 and
Table 1, page 2.
• Verify ratings and capacity data for natural gas. See
Table 2.
Installation Requirements
• Supply boiler with correct gas (natural or propane),
fresh air for combustion, and suitable electrical supply.
• Connect boiler to adequate venting and piping
systems.
• Provide boiler with properly located and adjusted
thermostat.
Installation of boiler in building under construction, use
precaution to insure clean combustion air supply during
construction process. Airborne particulate from construction
materials can clog burner ports and cause incomplete
combustion and sooting.
Complete all steps for safe and proper heating system
operation.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Peg112eidPeg187eidPeg150eidPeg225eidPeg262eidPeg299eid

Table of Contents