LG Multi-Inverter Service Manual page 76

Multi air conditioner
Hide thumbs Also See for Multi-Inverter:
Table of Contents

Advertisement

I 48/56k
CN(N)_BLUE
CN(N)_BLUE
CN(N)_BLUE
U,V,W CONNECTOR
U,V,W CONNECTOR
U,V,W CONNECTOR
1. Wait until inverter PCB DC voltage is discharged after main power off.
2. Pull out CN(L), CN(N) connectors and U,V,W COMP Connector.
3. Set multi tester to resistance mode.
4. If the value between P and N terminal of IPM is short(0Ω) or open(hundreds MΩ), PCB needs to be replaced.(IPM damaged)
5. Set the multi tester to diode mode.
6. In case measured value is different from the table, PCB needs to be replaced.(PCB damaged).
P
U
27
26
CAUTION
In case that the control box is opend and before checking electrical parts, it should be checked that the
LED 01M, 02M turned off(wait 7 minutes after main power OFF), otherwise it may cause electrical shock.
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
CN(L)_BRWON
CN(L)_BRWON
CN(L)_BRWON
V
W
Nu Nv Nw
25
24
23 22 21
0.4 ~ 0.6 V
LED01M
LED01M
LED01M
P
U
V
W
Nu Nv Nw
27
26
25
24
23 22 21
- 75 -
4. Trouble Shooting
U
U
V
V
W
W
LED02M
LED02M
LED02M
0.4 ~ 0.6 V
PFC_IPM chec
U, V, W ➔ R S
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents