Fitting Side Infill Panels - Potterton Prorile Prima 30e Installation And Servicing Instructions

Fanned balanced flue gas fired boilers
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS - Page 17
FIG. 23 ROUTING OF ELECTRICAL WIRING
Following the pump manufacturer's instructions connect the
pump supply wires to terminals marked PUMP LN
boiler terminal block. Route the cable through the plastic bush
in the rear of the control box as illustrated in FIG. 23 and
secure, using the cable clamp.
Route a four core cable through the plastic bush in the rear of
the control box and the cable clamp as illustrated in FIG. 23
and connect it to the boiler input terminals as follows:-
Permanent live to terminal marked MAINS 'L'.
Neutral to terminal marked MAINS 'N'.
Earth to terminal marked
See NOTE.
Switched live from external controls to terminal marked
MAINS 'SwL'.
If there are no external controls fitted connect the SwL terminal
to permanent live in the junction box.

FITTING SIDE INFILL PANELS

If required, the gap between the casing sides and rear wall can
be closed off using the infill panels supplied. Minimum or
maximum rear boiler clearance is catered for by turning the
infill panel. Attach each infill panel to the rear of the boiler
using two pieces of magnetic strip (accessory pack G)
positioned as illustrated.
on the
adjacent to cable clamp.
NOTE:
Ensure that the earth conductor is longer than the L, N & SwL
from the point of anchorage, so that the current carrying
conductors become taut before the earth conductor if cable is
pulled out of the cable clamp. When the wiring has been
completed close the control box and replace the securing
screw.
FIG 24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents