Whirlpool Electric Down Draft Surface Unit Installation Instructions Manual page 6

Electric down draft surface unit
Table of Contents

Advertisement

0
0
Install Surface Unit
Place surface
unit on its side (resting
on unfolded
cardboard
corner
insert
from
shipping
carton).
Remove
wood
skids
from
bottom,
install
Venting
Adapter
to Blower
Housing
by using the three screws provided.
See Figure
8.
NOTE:
Because
of the length
of the Venting
Adapter,
the
Blower
Housing
should
be rotated
downward
in
order
to clear the cabinet
opening
Insert
unit
into
countertop
opening
and tighten
hold down
bolts at each end of unit as shown
in Figure
9.
Install
the
cooking
components
in the surface
unit.
(For
the correct
installation
procedure,
see Use and Care Guide
in the Literature
Package.)
ENT ADAPTER
MOUNTING
SCREWS
\ \
\ \ BLOWER
\
7
6

Advertisement

Table of Contents
loading

Table of Contents