Symphonic LCD-B15E6 Service Manual page 7

15" color lcd television
Table of Contents

Advertisement

Safety Check after Servicing
Examine the area surrounding the repaired location
for damage or deterioration. Observe that screws,
parts and wires have been returned to original posi-
tions. Afterwards, perform the following tests and con-
firm the specified values in order to verify compliance
with safety standards.
1. Clearance Distance
When replacing primary circuit components, confirm
specified clearance distance (d) and (d') between sol-
dered terminals, and between terminals and surround-
ing metallic parts. (See Fig. 1)
Table 1 : Ratings for selected area
AC Line Voltage
Clearance Distance (d), (d')
230 V
Note: This table is unofficial and for reference only.
Be sure to confirm the precise values.
2. Leakage Current Test
Confirm the specified (or lower) leakage current be-
tween B (earth ground, power cord plug prongs) and
externally exposed accessible parts (RF terminals, an-
tenna terminals, video and audio input and output ter-
minals, microphone jacks, earphone jacks, etc.).
Measuring Method : (Power ON)
Insert load Z between B (earth ground, power cord
plug prongs) and exposed accessible parts. Use an
AC voltmeter to measure across both terminals of load
Z. See Fig. 2 and following table.
Table 2: Leakage current ratings for selected areas
AC Line Voltage
230 V
Note: This table is unofficial and for reference only. Be sure to confirm the precise values.
3mm(d)
6 mm(d')
Load Z
Leakage Current (i)
2kΩ RES.
i≤0.7mA AC Peak
Connected in
parallel
50kΩ RES.
i≤0.7mA AC Peak
Connected in
parallel
Chassis or Secondary Conductor
d'
Exposed Accessible Part
Z
One side of
B
Power Cord Plug Prongs
One side of power cord plug
i≤2mA DC
i≤2mA DC
2-4
Primary Circuit
d
Fig. 1
AC Voltmeter
(High Impedance)
Fig. 2
prongs (B) to:
RF or
Antenna terminals
A/V Input, Output
LTVP_ISP

Advertisement

Table of Contents
loading

Table of Contents