Midea Air Conditioner Installation Manual page 6

Two-way cassette type digital scroll and dc/ac inverter commercial air-conditioner
Hide thumbs Also See for Air Conditioner:
Table of Contents

Advertisement

Unit:mm
Fresh air connector 257
Φ160
The ceiling opening (1390*640)
4-2-2 Open the ceiling on the proper place.
1) The ceiling opening: The opening dimension please refers to the
panel attached installation template paper; for different
building structure, the actual situation please consults with the
architecture interior decoration personnel.
2) Disposal of the ceiling: To make sure the horizontal of the ceiling
and avoid the ceiling vibration, the base frame of the ceiling
must be strengthened.
3) Cut off and remove the base frame of the ceiling.
4) Strengthen the end face which left after take off the ceiling, and
strengthen the base frame use for fixing the both sides of
the ceiling.
5) After installing the main body, then piping and wiring in the
ceiling, and then decide the piping leading out direction after
selecting the installation location.
Especially in the situation where already has ceiling, please wiring
the refrigerating pipe, drain pipe, indoor and outdoor units
connecting wire and line-controlling wire to the connecting
positions.
6) Please use M10 hanging bolt.
1172
57
701
45
1430
The panel contour dimension 1430
20
The ceiling opening dimension 1390
Hanging screw bolts distance 1207
Machine body size 1172
701
129 129
20
129
The relative position relation of the ceiling and air-conditioner
NOTE
All the pictures in this manual are for explanation purpose only.
They may be slightly different from the air conditioner you
purchased(depend on model).The actual shape shall prevail.
591
436
241
185
44
120
104
91
680
Fig.4-3
Surface of the opening ceiling
Fig.4-4
installation manual
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mdv-d series

Table of Contents