Table Of Contents; Required Tools - LG SJ122CD Installation Manual

Room air conditioner
Table of Contents

Advertisement

Available languages

Available languages

TABLE OF CONTENTS

Requirements
Safety Precautions............................3
Introduction ........................................6
Features ...........................................6
Installation ..........................................7
Installation parts...............................7
Installation tools ...............................7
Installation map................................8
Fixing installation plate..................11
Drilling a hole in the wall ...............11
Flaring work ...................................12
Connecting the piping ..................13
Connecting the cables ..................19
Checking the drainage ..................21
Forming the piping.........................22
Air purging......................................23
Test running ...................................25
2 Room Air Conditioner
Room Air Conditioner Installation Manual
Required Parts
Four type "A" screws & plastic
anchors
Connecting cable
Installation guide map
Pipes: Gas side
Liquid side
Insulation materials
(Outer diameter ..............15.5mm)
Two type "B" screws

Required Tools

Level gauge
Screw driver
Electric drill
Hole core drill(ø70mm)
Horizontal meter
Flaring tool set
Specified torque wrenches
1.8kg.m, 4.2kg.m, 5.5kg.m,
6.6kg.m
(different depending on model No.)
Spanner ........................Half union
A glass of water
Screw driver
Hexagonal wrench(4mm)
Gas-leak detector
Vacuum pump
Gauge manifold
Owner's manual
Thermometer
Remote control holder

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents