LG SJ122CD Installation Manual page 16

Room air conditioner
Table of Contents

Advertisement

Available languages

Available languages

Installation
Wrap the insulation material around the
connecting portion.
1. Overlap the connection pipe heat insulation
and the indoor unit pipe heat insulation
material. Bind them together with vinyl tape
so that there may be no gap.
2. Wrap the area which accommodates the rear
piping housing section with vinyl tape.
3. Bundle the piping and drain hose together by
wrapping them with cloth tape over the range
within which they fit into the rear piping
housing section.
Reroute the pipings and the drain hose
across the back of the chassis.
Indoor unit installation
1. Remove the spacer.
2. Ensure that the hooks are properly seated on
the installation plate by moving it left and
right.
3. Press the lower left and right sides of the unit
against the installation plate until the hooks
engage into their slots(clicking sound).
16 Room Air Conditioner
Plastic bands Insulation material
Connection
pipe
Vinyl tape
Wrap with vinyl tape
(wide)
Connecting cable
Drain hose
Piping for
passage through
piping hole
Indoor
unit piping
Pipe
Vinyl tape(narrow)
Pipe
Vinyl tape(narrow)
Wrap with
vinyl tape(wide)
Connecting
cable
Drain hose

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents