Commissioning and Handover

Upon completion of the installation, allow a suitable period of time for any fire cement and
mortar to dry out. A small fire may then be lit and checked to ensure the smoke and fumes
are taken from the stove up the chimney and emitted safely to atmosphere. Do not run the
stove at full output for at least 24 hours.
On completion of the installation and commissioning, ensure that the operating instructions
and operating tools for the stove are left with the customer. Ensure to advise the customer on
the correct use of the appliance with the fuels likely to be used on the stove and warn them to
use only the recommended fuels for the stove.
Advise the user on what to do should smoke or fumes be emitted from the stove. The user
should be warned to use a fireguard to BS 6539 in the presence of children, aged and/or
infirm persons.
75mm
125mm
50mm
Note: walls and hearth
are non-combustible and
all dimensions stated are
minimum

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents