Pump Down Operation - Daikin FTXS20G2V1B Installation Manual

R410a split series
Hide thumbs Also See for FTXS20G2V1B:
Table of Contents

Advertisement

Refrigerant Piping Work
2-1. Caution on piping handling.
1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender
for bending.
(Bending radius should be 30 to 40mm or larger.)
2-2. Selection of copper and heat insulation materials.
• When using commercial copper pipes and fittings, observe the following:
1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK (0.035 to 0.045 kcal/(mh•°C))
Refrigerant gas pipe's surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.
2) Be sure to insulate both the gas and liquid piping and to provide insulation dimen-
sions as below.
Gas side
20/25/35/42
class
O.D. 9.5mm
3) Use separate thermal insulation pipes for gas and liquid refrigerant pipes.

Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.
1) Remove the valve cap from liquid stop valve and gas stop valve.
2) Carry out forced cooling operation.
3) After five to ten minutes, close the liquid stop valve with a hexagonal wrench.
4) After two to three minutes, close the gas stop valve and stop forced cooling operation.
How to force cooling operation mode
■ Using the indoor unit operation/stop button
Press the indoor unit operation/stop button for at least five seconds.
(Operation will start.)
• Forced cooling operation will stop automatically after around 15 minutes.
To force a test run to stop, press the indoor unit operation/stop button.
■ Using the main unit's remote controller
1) Press the "operation/stop" button.
(Operation will start.)
2) Press the temperature
3) Press the "operation select" button twice.
(
will be displayed and the unit will enter test run mode.)
4) Press the "operation select" button to return the operation mode to cooling.
• Test run mode will stop automatically after around 30 minutes. To force a test run to stop, press the operation/stop button.
CAUTION
1) After closing the liquid stop valve, close the gas stop valve within three minutes, then stop the forced operation.
11
Liquid side
50 class
O.D. 12.7mm
O.D. 6.4mm
Thickness 0.8mm
button and the "operation select" button at the same time.
Rain
Gas pipe thermal insulation
20/25/35/42
50 class
class
I.D. 12-15mm
I.D. 14-16mm
Thickness 10mm Min.
Be sure to
place a cap.
If no flare cap is
available, cover
the flare mouth
with tape to keep
dirt or water out.
Inter-unit wiring
as pipe
Liquid pipe
as pipe
Liquid pipe
insulation
insulation
Finishing tape
Drain hose
Liquid pipe
thermal
insulation
I.D. 8-10mm
Hexagonal
wrench
Liquid
stop valve
Close
Gas
stop valve
Valve cap
■English
all

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxs25g2v1bFtxs35g2v1bFtxs42g2v1bFtxs50g2v1b

Table of Contents