Framing Enclosure For Lp Gas Supply System - Firegear Prairie Glow Owner's Manual

Outdoor fire pits decorative gas log set installation and operation
Table of Contents

Advertisement

C. Framing Enclosure for LP Gas Supply System
If you build an enclosure for an LP gas cylinder, follow these
recommended specifications and local codes:
Ventilation
Enclosures must be ventilated by openings at the level of
the cylinder valve and at floor level. Effectiveness must be
determined with the cylinder(s) in place.
• One side of the enclosure must be completely open.
• For an enclosure having four sides, a top and a bottom:
- At least two ventilation openings at cylinder valve level
shall be provided in the side wall, equally sized, spaced
at 180 degrees (3.14 rad), and unobstructed. Each
opening must have a total free area of not less than
1/2 square inch per pound (3.2 sq. cm/kg) of stored
fuel capacity and not less than a total free area of 10
square inches (64.5 sq. cm).
- Ventilation opening(s) must be provided at floor level
and shall have a total free area of not less than 1/2
square inch per pound (3.2 sq. cm/kg) of stored fuel
capacity and not less than a total free area of 10
square inches (64.5 sq. cm). If ventilation openings
at floor level are in a side wall, there must be a least
two openings. The bottom of the openings must be
at floor level and the upper edge can't be more than
5 in. (127 mm) above the floor. The openings must
be equally sized, spaced at 180 deg (3.14 rad) and
unobstructed.
- Every opening must have minimum dimensions to
permit the entrance of a 1/8 inch (3.2 mm) diameter
rod.
Accessibility
• Cylinder valves must be readily accessible for hand
operation. A door on the enclosure to gain access to the
cylinder valves is acceptable, provided it is non-locking
and can be opened without the use of tools.
• The design of the enclosure must be such that:
-
The LP gas supply cylinder(s) can be connected,
disconnected and the connections inspected and
tested outside the cylinder enclosure.
-
Those connections which could be disturbed when
installing the cylinder(s) in the enclosure can be leak
tested inside the enclosure.
-
Be certain to mount or set the LP gas cylinder on a flat
stable surface and retain it to prevent it from tipping.
Minimum Clearances
There must be a minimum clearance of 2 in. (50.8 mm)
between the lower surface of the floor of the LP gas supply
cylinder enclosure and the ground.
Outdoor Fire Pits - 2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

ImpressionReflectionPhoenixCharlotte blaze

Table of Contents