Installation Instructions; Moving And Uncrating The Boiler; Setting Boiler - American Standard TGBWF090A93AVA Installation Manual

Natural draft, gas fired water boiler with electronic ignition and cast iron heat exchanger
Table of Contents

Advertisement

3.0 Installation Instructions

3.1 Moving and Uncrating the Boiler

▲ ▲
WARNING
!
SAFETY HAZARD
WHEN MOVING THE BOILER TO THE INSTAL-
LATION LOCATION, ENSURE THE STRUC-
TURE (I.E. FLOORS, STAIRS, PEDESTALS)
CAN SUPPORT THE WEIGHT OF THE BOILER,
DOLLY AND OTHER MOVING EQUIPMENT
AND THE PERSONNEL MOVING THE BOILER.
FAILURE TO FOLLOW THIS WARNING COULD
RESULT IN SERIOUS INJURY, DEATH, OR PRO-
PERTY DAMAGE
▲ ▲
CAUTION
!
Use caution when inserting and removing safety
blocks. Make sure boiler will not fall off safety
blocks.
Failure to obey caution could result in minor or
moderate injury.
1. Move crated boiler as close as possible to the
location to be installed. Uncrate the boiler
using a saw to cut the four bottom corner
posts even with the top of the pallet. The top
When boiler
is ready to be
uncrated, use a
saw to cut the
four vertical
corner boards just
above the base of
the crate.
18-CG01D1-4
10
of the crate can then be lifted off of the boiler.
See Figures 3 and 4.
2.
If the boiler can not be moved with crate
assembled, uncrate the boiler and use an
appliance dolly to move the boiler to the
selected location. Use a saw to cut the four
corner posts even with the top of the pallet.
The top of the crate can then be lifted off of
the boiler. See Figures 3 and 4.
3.
There are four bolts that attach the boiler
to the pallet. The bolts are located near the
four corners of the boiler and are attached
from the bottom side of the pallet. Locate
and use a wrench or socket to remove the
four bolts.

3.2 Setting Boiler

1.
Verify the fl oor structure where the boiler will
be set can support the weight of the boiler.
2.
Locate the boiler so all components are pro-
tected from water damage during operation.
3.
As required, raise the boiler above the fl oor
level to reduce the risk of water damage.
4.
Consult ANSI Z223.1 for garage applications.
5.
Move the boiler to the installation location
with an appliance dolly. If required, the boiler
jacket may be removed to simplify handling.
To remove the boiler jacket, follow the steps listed
below.
a.
Remove the front access panel (see Figure 53).
b.
Remove the top access panel (see Figure 52).
c.
Raise the cover on the control panel (See
Figure 52) and locate the screw access holes
at the top left and right of the panel. Insert
a phillips screwdriver and remove the two
screws. Lower the control box.
d.
Remove the left and right boiler jacket panels
by removing the phillips screws securing the
panels.
e.
Move and set the boiler.
f.
Reassemble the boiler jacket, control panel
Figure 3
and front access panel. Leave the top panel
off until the boiler is leveled using the adju-
stable feet.
Figure 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents