Testing; Replacing The Lid; Changing The Fuse - Pyramid Ac receiver Installation Manual

Table of Contents

Advertisement

Pyramid AC Receiver
WARNING
• The AC receiver PCB now contains live voltages.
• Before running the test procedure, fit the Pan/Tilt head in its intended position and ensure that it cannot collide
with anything or stretch any cables. Electrical and mechanical limit stops should be set to prevent such events.
Electrical limit stops can be set using the Pyramid 2 Keyboard—consult the Pyramid 2 Keyboard Operating
Manual for more details.
Step
Action
Page 18
Time
Step
Installation Manual
Action
Time

REPLACING THE LID

CHANGING THE FUSE

TESTING

Advertisement

Table of Contents
loading

Table of Contents