Samsung CM-1819 Service Manual page 41

Table of Contents

Advertisement

9-2 Description of Operating Sequence (continued)
Initial operating status of Power Relay when the START button is pressed.
Relays are designed to work as shown in the figure below.
When the oven is set to DEFROST power position, Inrush Relay1 and Power Relay1 are programmed to
work with Inrush Relay2 and Power Relay2 not simultaneously but alternately.
Operating
Sequence
NOTE :
LAMP: Lamp Relay (250V 5A)
MAIN: Main Relay (250V 16A)
VENT: Ventilation Motor Relay (250V 5A)
IR1: Inrush Relay1 (250V 5A)
IR2: Inrush Relay2 (250V 5A)
P1: Power Relay1 (250V 16A)
P2: Power Relay2 (250V 16A)
Samsung Electronics
Operating Time of Relays (100%, 70%, 50% power)
Wiring Diagram & Operating Sequence
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cm-1419Cm-1829Cm-1429Cm-142

Table of Contents