Figure 3: Board Packaging; Handling - GE VR11 Reference Manual

Intel core 2 duo/intel core duo 6u vme sbc
Table of Contents

Advertisement

Handling

GE Intelligent Platforms – VR11, VP11 Hardware Reference Manual, Second Edition
Proper handling of the board or module is critical to ensure proper operation
and long-term reliability. When unpacking the board, and whenever handling it
thereafter, be sure to hold the board by the front panel as shown. Do not hold
the board by the circuit card edges, the heat sink, or the connectors.

Figure 3: Board packaging

Page 30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp11

Table of Contents