WD536
BOILER SERIAL No. ___________________
CONTROLS
To comply with the Building Regulation, each section must have a tick in one or other of the boxes
TIME & TEMPERATURE CONTROL TO
HEATING
TIME & TEMPERATURE CONTROL TO HOT
WATER
HEATING ZONE VALVES
HOT WATER ZONE VALVES
THERMOSTATIC RADIATOR VALVES
AUTOMATIC BYPASS TO SYSTEM
FOR ALL BOILERS CONFIRM THE FOLLOWING
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER'S INSTRUCTIONS ?
THE SYSTEM CLEANER USED
THE INHIBITOR USED
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
GAS RATE
BURNER OPERATING PRESSURE (IF APPLICABLE)
CENTRAL HEATING FLOW TEMPERATURE
CENTRAL HEATING RETURN TEMPERATURE
FOR COMBINATION BOILERS ONLY
HAS A WATER SCALE REDUCER BEEN FITTED ?
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED ?
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD
GAS RATE
MAXIMUM BURNER OPERATING PRESSURE (IF APPLICABLE)
COLD WATER INLET TEMPERATURE
HOT WATER OUTLET TEMPERATURE
WATER FLOW RATE
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS ?
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING
THE HEATING AND HOT WATER SYSTEM COMPLIES
WITH CURRENT BUIDING REGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMISSIONED
IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDE A CO/CO
THE OPERATION OF THE APPLIANCE AND SYSTEM
CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
Installation & Servicing Instructions
Chapter 9 : Benchmark Checklist Final
9. GAS BOILER COMMISSIONING CHECKLIST
GAS BOILER COMMISSIONING CHECKLIST
BENCHMARK No.
NOTIFICATION No. ____________________
ROOM T/STAT &
PROGRAMMER/TIMER
CYLINDER T/STAT &
PROGRAMMER/TIMER
FITTED
FITTED
FITTED
FITTED
RATIO READING?
2
The Keston C45, C40P, C55 & C55P
PROGRAMMABLE ROOMSTAT
COMBI BOILER
NOT REQUIRED
NOT REQUIRED
NOT REQUIRED
3
m
/hr
N/A
YES
3
m
/hr
N/A
N/A
YES
3
ft
/hr
mbar
O
C
O
C
NO
3
ft
/hr
mbar
O
C
O
C
lts/mi
n
YES
CO/CO
2
RATIO
Page : 47